Type : Contract
REPLACE COOLING TOWERS AE DESIGN, PROJECT 526-19-132 Solicitation ID/Procurement Identifier: 36C24219R0062 Ultimate Completion Date: Tue Sep 30 17:00:00 GMT 2025
REPLACE COOLING TOWERS AE DESIGN, PROJECT 526-19-132 Solicitation ID/Procurement Identifier: 36C24219R0062 Ultimate Completion Date: Tue Sep 30 17:00:00 GMT 2025
Please see attached SF 330 Request for the AE Install Boiler & Upgrade Cooling Tower project at the Marion Campus of the Northern IN VA Healthcare System. Interested AE Firms are encouraged to submit SF 330s for consideration.**NOTE** NAICS has been revised from 541310 to 541330.
New cooling towers shall be energy efficient with legionella control, reduced drift, water savings, etc. The chilled water lines will tie into the existing chilled water loop for a more robust chilled water system. Building shall be designed such that the architectural style is like other campus buildings.
The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.
The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.
The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.
The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.