Type : Bid Notification
Copper Piping and Fittings
Copper Piping and Fittings
Piping for this generator will need to be replaced. 30 Scaffolding will have to be constructed to reach placement of 4 diameter X 5 long copper piping that is also damaged. All information must be received no later than: October 18th, 2018, 10:00AM PDT.
Piping for this generator will need to be replaced as stated in line three (3) of scope of work. 30 Scaffolding will have to be constructed to reach placement of 4 diameter X 5 long copper piping that is damaged. 4. SERVICE REPORT: 4.1. The Contractor's service representative will report upon arrival to the Point of Contact or his/her designee.
EMERGENCY REPAIR FOR CRAC TO REPLACE/RE-ROUTE ALL COPPER PIPING ASSOCIATED WITH THE CRAC SYSTEM. Solicitation ID/Procurement Identifier: 140G0123P0068 Ultimate Completion Date: Fri Jul 14 17:00:00 GMT 2023
By relocating the hot water return, pumps, and re-routing all the copper lines it will eliminate excess piping and fittings which means less water leaks in the system. The system at this time has had many water leaks from the compression fittings. *See Solicitation for Site Visit Instructions which takes place June 26, 2023.
By relocating the hot water return, pumps, and re-routing all the copper lines it will eliminate excess piping and fittings which means less water leaks in the system. The system at this time has had many water leaks from the compression fittings. *See Solicitation for Site Visit Instructions which takes place June 26, 2023.
The original galvanized piping will be replaced by copper piping and will include isolation gate valves to support ongoing and future maintenance of this facility. 04/25/2024 07:01 PM UTC