Search results for: corridor permit

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 26
  • Decision to Renew Jumbo Dome Mine Road Corridor Permit (Permit # S-0605)

    Type : Bid Notification

    Due : 26 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 26 May, 2023 (11 months ago)

    Public Notice of Decision to Renew Jumbo Dome Mine Road Corridor Permit (Permit # S-0605) The Alaska Department of Natural Resources, Division of Mining, Land and Water (DMLW) has completed its review of a request from Usibelli Coal Mine, Inc. (UCM), P.O.

    From: Alaska (State)

  • Permit Renewal For The Jumbo Dome Mine Road Corridor Permit: S-0605

    Type : Bid Notification

    Due : 13 Feb, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 21 Dec, 2022 (16 months ago)

    Public Notice of Renewal ForThe Jumbo Dome Mine Road Corridor Permit: S-0605An application for renewal of the Jumbo Dome Road Corridor, Permit Number S-0605 has been filed with the State of Alaska, Department of Natural Resources, Division of Mining, Land and Water, Mining Section (DMLW-Mining), by Usibelli Coal Mine, Inc. (UCM), P.O. Box 1000, Healy, Alaska 99743.

    From: Alaska (State)

  • AQI - Exit Lane Breach Control – Access 1600E

    Type : Bid Notification

    Due : 16 Nov, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 07 Oct, 2022 (18 months ago)

    AQI - Exit Lane Breach Control – Access 1600E Project Description :An automated one-way exit corridor and a double standard door are to be installed to replace the double sliding door at access 1600E. As to maximize security, the one-way exit corridor will permit arriving passengers to leave the sterile area and access the public (city side) area, while restrain access to the sterile area from individuals on the city side.

    From: MerX (Federal)

  • Adaptive Traffic Control Systems (ATCS) on Hallandale Beach Blvd and US-1

    Type : Bid Notification

    Due : 02 May, 2024 (in 3 days)
    Posted : 9 days ago
    Started : 01 Apr, 2024 (27 days ago)

    addition, Contractor shall be responsible to pay for, re-apply for, and/or obtain the renewal for the following permits: The column for “Corridor” has been revised as follows: Miramar Parkway Hallandale Beach Boulevard Deletes and replaces in its entirety the documents specified as ‘New Documents’ and ‘Removed Documents’.

    From: Bridgeport (City)

  • Adaptive Traffic Control Systems (ATCS) on Hallandale Beach Blvd and US-1

    Type : Bid Notification

    Due : 02 May, 2024 (in 3 days)
    Posted : 27 days ago
    Started : 01 Apr, 2024 (27 days ago)

    addition, Contractor shall be responsible to pay for, re-apply for, and/or obtain the renewal for the following permits: The column for “Corridor” has been revised as follows: Miramar Parkway Hallandale Beach Boulevard Deletes and replaces in its entirety the documents specified as ‘New Documents’ and ‘Removed Documents’.

    From: Broward County Board of County Commissioners (County)

  • 32nd Street Underpass Project - Request for Qualifications Owner's Advisor

    Type : Bid Notification

    Due : 16 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 15 Dec, 2023 (4 months ago)

    As a result, access to Washougal Town Center, is indirect and limited, presenting an obstacle to downtown and waterfront revitalization around the Columbia River and the Port of Camas-Washougal jobs center.The City seeks to design and permit 32nd Street Corridor enhancements, including the separation of the dangerous at-grade rail crossing between Main Street/B Street and Evergreen Way.

    From: Washougal (City)

  • 7857 - Design Build-Step 1-Golden Gate Pkwy over Santa Barbara Canal Bridge Replacement

    Type : Bid Notification

    Due : 19 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 15 Jan, 2021 (about 3 years ago)

    Answer: The plans for the existing bridge have been uploaded to BidSync:    21-7857 Addendum 1 – Exhibit M – 100% Plans 09-01-1971_SIRE  Added on Feb 5, 2021:ADDENDUM 2: CHANGE 1:   Revision to Page 3 of 21-7857 Design Build Step 1 Solicitation: The DBF shall review the RPS/DCP Documents, Project corridor and Environmental Permits obtained by the DBF COUNTY.

    From: Collier County ()