Search results for: cover and odor control

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 214
  • aluminum tank odor control cover system

    Type : Bid Notification

    Due : 09 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 25 Apr, 2018 (about 6 years ago)

    Header InformationBid Number: BD-17-1146-1146C-CHIC-26394 Description: aluminum tank odor control cover system Bid Opening Date: 05/09/2018 11:00:00 AM Purchaser: Brian Salamon Organization: City of Chicopee Department: 1146CONVD - City of Chicopee Location: CHIC - City of Chicopee Fiscal Year: 17 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: Yes Alternate Id: Required Date: 04/25/2018 Available Date : 04/25/2018 12:00:00 AMInfo

    From: Massachusetts (State)

  • Secondary Digester Cover and Odor Control

    Type : Contract

    Due : 08 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 21 Nov, 2022 (17 months ago)

    Secondary Digester Cover and Odor Control Agency: Long Beach, City of Category:Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction Issue Date:11/21/2022 Due Date: 12/08/2022 Ad Type:General

    From: New York State Contract Reporter (City)

  • Rose Creek Odor Control Phase 3 Project

    Type : Bid Notification

    Due : 15 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 13 Aug, 2020 (about 3 years ago)

    The project generally consists of the furnishing of the labor, materials, and equipment for the construction and start-up of the digester cover and odor control system for digester #3 at the Rose Creek WPCP. The project includes a new aluminum cover system and a new carbon odor control system, including associated structural systems, duct work, electrical systems, and all other work required to provide a fully functional system.

    From: Georgia (State)

  • S--Maintenance of Restroom Odor Control Units

    Type : Bid Notification

    Due : 20 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 16 Aug, 2018 (about 5 years ago)

    Answer: A) The Vendor is responsible for removing, disposing and installing the new odor control units. B) You do not have to keep the same make or/or model. C) The area around the removed units may require repairs as the new units may not cover the entire space previously holding the mounted odor control units.Question 3: Please provide the wage determination for this solicitation.

    From: Federal Government (Federal)

  • PPYSVentilation Improvements and Odor Control System

    Type : Bid Notification

    Due : 14 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Sep, 2021 (about 2 years ago)

    Improvements include but are not limited to the replacement of an odor control system, modification of existing ductwork and ventilation systems, addition of an aluminum channel and wet well cover system, and installation of associated instrumentation, control, and electrical equipment. Amendment/Cancellation Information: ITB 21-023 Pre-Bid Meeting Slides: Document provided for information only, Bid Set Documents and any Addendums govern.

    From: Virginia (State)

  • PPYSVentilation Improvements and Odor Control System

    Type : Bid Notification

    Due : 21 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Sep, 2021 (about 2 years ago)

    Improvements include but are not limited to the replacement of an odor control system, modification of existing ductwork and ventilation systems, addition of an aluminum channel and wet well cover system, and installation of associated instrumentation, control, and electrical equipment. Amendment/Cancellation Information: Responses to bidder questions.

    From: Virginia (State)

  • PPYSVentilation Improvements and Odor Control System

    Type : Bid Notification

    Due : 21 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Sep, 2021 (about 2 years ago)

    Improvements include but are not limited to the replacement of an odor control system, modification of existing ductwork and ventilation systems, addition of an aluminum channel and wet well cover system, and installation of associated instrumentation, control, and electrical equipment. Amendment/Cancellation Information: Responses to bidder questions.

    From: Virginia (State)