Type : Contract
REPLACEMENT OF THE CRAC SYSTEM AT THE IRS IN THE MAZZOLI FEDERAL BUILDING IN LOUISVILLE, KY. Solicitation ID/Procurement Identifier: 4P1BBE-24-0005 Ultimate Completion Date: Tue Nov 26 18:00:00 GMT 2024
REPLACEMENT OF THE CRAC SYSTEM AT THE IRS IN THE MAZZOLI FEDERAL BUILDING IN LOUISVILLE, KY. Solicitation ID/Procurement Identifier: 4P1BBE-24-0005 Ultimate Completion Date: Tue Nov 26 18:00:00 GMT 2024
The CRAC system shall be designed to be independent of the Air Conditioning (ACR) system and maintain the room temperature and relative humidity when ACR units are powered off. Supply air to flow from the top of the from CRAC units and not into the subfloor.
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
EMERGENCY REPAIR FOR CRAC TO REPLACE/RE-ROUTE ALL COPPER PIPING ASSOCIATED WITH THE CRAC SYSTEM. Solicitation ID/Procurement Identifier: 140G0123P0068 Ultimate Completion Date: Fri Jul 14 17:00:00 GMT 2023
The CRAC system shall be designed to be independent of the Air Conditioning (ACR) system and maintain the room temperature and relative humidity when ACR units are powered off. Supply air to flow from the top of the from CRAC units and not into the subfloor.Draft specifications and drawings are being provided for INFORMATIONAL PURPOSES ONLY and may change upon formal issuance of solicitation.
Period of Performance is not determined, it may be one-year base period plus two(2) one-year option periods or one-year base period plus four (4) one-year option periods.FIMUE Service ScopeCategory A: Generator, ATS (Auto Transfer Switch)Category B: UPS (Uninterruptable Power Supply), AC UPS System, DC UPS System, Fly-Wheel UPS SystemCategory C: ECU (Environmental Control Unit), HVAC (heating, ventilation, & air conditioning) System (Water/Gas), CRAC
Seamless integration and compatibility with the rest of the existing system is required.3) Computer Room Air Conditioning (CRAC) Systems by Liebert: Portions of the project will involve replacing existing Liebert CRAC units which support the UPS cooling.