Type : Bid Notification
Contract shall include all labor, materials, tools, equipment, and related items necessary to install crack fill as shown on the Drawings and as specified herein.
Contract shall include all labor, materials, tools, equipment, and related items necessary to install crack fill as shown on the Drawings and as specified herein.
Crack Filling - The Contractor’s Work under this Contract shall include all labor, materials, tools, equipment, and related items necessary to install crack fill as shown on the Drawings and as specified herein. This Work includes cleaning, drying, and filling the longitudinal and transverse cracks in asphaltic pavement. Crack sealing shall take place prior to striping.
:YESAward Date:17 Aug 2021Term - Initial (in years):2Term Additional (in years):3Extendable Thru:16 Aug 2026Opportunity: Crack Fill and Seal View OpportunityFilesShow/Hide Download grid export Drag here to set row groupsDrag here to set column labels Name Type Date Created Action ACON19521.pdfContractAug 31, 2021DownloadACON19521A.pdfAmendmentJul 19, 2022DownloadACON19521B.pdfAmendmentOct 5, 2023Download Columns Name to of Page of
Remove the existing asphalt and undercut the areas to receive 4” of stone base and 2” of asphalt OR crack fill and seal coat the existing areas as shown on drawings provided by Cumberland County Schools. The areas are to be re-striped per the original layout. All areas are to be prepared to receive seal coating.
Synopsis to Provide Parking Lot Repair for the EPA Ada, OK FacilityRFQ 68HERC24Q010504/16/2024The U.S. Environmental Protection Agency (EPA) intends to solicit a Request for Proposals for the repair of the Main parking lot at the main facility of the Robert S. Kerr Environmental Research Center (RSKERC) located at 919 Kerr Research Drive, Ada, Oklahoma 74820. The General Contractor shall provide all supervision, labor, materials, tools, equipment, hardware, and documentation necessary to complete the project. The set-aside is anticipated to be Total Small Business. The period of performance will be 120 days after issuance of award and Notice to Proceed.In accordance with FAR 13.500(a), the solicitation is anticipated to utilize simplified a...
Crack fill and skim patch as needed. Install wheel stops at all parking spaces in main parking lot. Sealcoat all asphalt on site. Re-stripe all lines, parking lots, loading zones, fire lanes, bollards, sport courts, game posts, and markings on concrete. Other Details See attached advertisement for project-specific requirements and how to obtain bid documents, plans, and specifications.
× Project: Tennis Court Rehabilitation at Sparks High School Project #: 24-106-B-05-DA Scope of Work: Grind, crack fill/seal, asphalt overlay for three (3) tennis courts complete which includes the posts, nets, fencing, and concrete walk.