Type : Bid Notification
Corporation of the Township of Langley invites tenders for: Replacement of the Matheson Creek tributary culvert crossing located at the 20100 block of 64 Ave.
Corporation of the Township of Langley invites tenders for: Replacement of the Matheson Creek tributary culvert crossing located at the 20100 block of 64 Ave.
San Pablo Creek Culvert Specifications SAMPLE CONSULTANT CONTRACT
MDOT Item # 011 Engineer's Estimate $416,000 Prequal Class N9-1A DBE % 0% County Monroe & Washtenaw Description Bridge rehab epoxy overlay, deck patching, substructure repairs, culvert walls patching, culvert walls underdrain extension, wingwall patching and joint waterproofing on Sulphur Creek culvert under M-125 and on M-52 bridge over Raisin River Bid Date 05/03/2024 Estimator John W. Kersaan
PIN 9755.16 - CR 10A over Unknown Creek Culvert Replacement Agency: Chenango County Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:04/09/2024 Due Date: 04/30/2024 Ad Type:General
Description: General work description: The work to be done generally consists of removing debris in the culvert, cleaning the culvert invert, preparing concrete surfaces and exposed rebar, installing new rebar along the culvert invert, overlaying the culvert invert, installing new concrete beam and steel struts, repairing storm drain connection to the culvert, and bypass of creek channel flows as necessary for construction.
Description: General work description: The work to be done generally consists of removing debris in the culvert, cleaning the culvert invert, preparing concrete surfaces and exposed rebar, installing new rebar along the culvert invert, overlaying the culvert invert, installing new concrete beam and steel struts, repairing storm drain connection to the culvert, and bypass of creek channel flows as necessary for construction.
Silver Creek Culvert Project Project Description :The RM of Ellice – Archie is now accepting Requests for Proposals on a three-barrel CSP Culvert Site repair on Silver Creek. Location: Rd 169W, E-23-18-29-W Scope of Work: Replace damaged culverts, Rebuild Road, Rip rap placement Please contact the CAO for project details and timelines. Deadline for “Silver Creek Culvert Project” quotes: Friday, October 6th, 2023, 12 noon.