Search results for: creek dam spillway

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 139
  • Ivy Creek Dam Spillway Repair

    Type : Bid Notification

    Due : 14 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 04 Mar, 2021 (about 3 years ago)

    Ivy Creek Dam Spillway Repair Status: Open IFB 2021-046-1 City of Lynchburg -Lynchburg, VA Closing On: 4/14/21 3:00 PM Time Left: 23 days This project is to repair the Ivy Creek Dam Spillway as noted in the contract documents and related drawings. IFB Construction Closing On: 4/14/21 3:00 PM Time Left: 23 days View Opportunity Add to Favorites   View Opportunity Add to Favorites

    From: Virginia (State)

  • Beaverdam Creek Dam Spillway Repl & Dam Improvements Project

    Type : Bid Notification

    Due : 21 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 17 Jan, 2024 (3 months ago)

    Demolition of the existing dam spillway and installation of new dam spillway. 2. Removal of existing French drain at the embankment toe and install new toe drain. 3. Installation of soil buttress on downstream face of dam embankment. 4. Extend existing reservoir drain outlet pipe.

    From: Virginia (State)

  • SPILLWAY INVESTIGATION AND REPAIR - WILLOW CREEK DAM

    Type : Bid Notification

    Due : 08 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 11 Apr, 2018 (about 6 years ago)

    Open SPILLWAY INVESTIGATION AND REPAIR - WILLOW CREEK DAM Engineering services Open 4/11/2018 1:00 AM MDT Close 5/8/2018 3:00 PM MDT Type RFP/RFQ Number DNRC-RFP/RFQ-2018-1049 Contact Gwenette Ungerman ungermang@mt.gov Details View as PDF Respond Now

    From: Montana (State)

  • RFP - Trader's Point Spillway Improvements

    Type : Bid Notification

    Due : 31 Dec, 2026 (in about 2 years)
    Posted : 22 months ago
    Started : 30 May, 2022 (23 months ago)

    Trader’s Point Lake formed by the dam is on Bush’s Run which feeds directly into Eagle Creek Reservoir and is also upstream of critical interstate infrastructure. A. Scope of Services I.

    From: Indiana Finance Authority (State)

  • Pipestem Dam Spillway Modification Project, Pipestem Creek, Jamestown, ND.

    Type : Pre-Bid Notification

    Due : 06 Jun, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 31 Mar, 2022 (about 2 years ago)

    The spillway modification also includes lowering of the upstream spillway channel and the approach channel to 6 to 8 feet below existing grade. 

    From: Federal Government (Federal)

  • Hills Creek Dam Spillway Rockfall & Reinforcement

    Type : Award

    Due : 05 Oct, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 21 Sep, 2023 (7 months ago)

    Contract Opportunity Award Details General Information Classification Description Attachments/Links Contact Information History Award Notices Follow Hills Creek Dam Spillway Rockfall & Reinforcement Active Contract Opportunity Notice ID W9127N23C0021 Related Notice W9127N23R0031 Contract Line Item Number Department/Ind.

    From: Federal Government (Federal)

  • Bull Creek Old Lampasas #3 Dam Modernization

    Type : Bid Notification

    Due : 03 May, 2024 (1 day ago)
    Posted : 18 days ago
    Started : 18 Apr, 2024 (16 days ago)

    Type:Invitation For Bids (IFB) Status: Open Solicitation Number:IFB 6100 CLMC1040 Description:Bull Creek Old Lampasas #3 Dam Modernization Summary:The Work consists of grading and resurfacing the upstream and downstream embankment slopes of the dam, replace the existing principal spillway with a new 42” diameter reinforced concrete pipe and cradle, installation of a new intake structure and low flow riser upstream, raise the top of dam & auxiliary

    From: Austin (City)