Type : Bid Notification
Earterly Creek Detention Pond
Earterly Creek Detention Pond
Project: RFSQ - Professional Architectural and/or Engineering Services to provide Construction Phase Services for Dinner Creek Detention Basin (Phase II) for the Harris County Flood Control District (CDBG/MIT/GLO) Ref. #: 23/0406 Type: RFSQ Status: Open Open Date: Oct 18th 2023, 10:00 AM CDT Questions Due Date: Nov 3rd 2023, 12:00 PM CDT Contact Information: Kenneth Jackson, kenneth.jackson
The project will entail the replacement of the Cowart Creek Pump Station Generator at 7800 Carrie Lane, Pearland, Texas 77584. This work includes but is not limited to: replacing manual transfer switch with new automatic transfer switch. Provide new electrical equipment and new 500 kva diesel generator with skid tank. Provide all necessary structural concrete paving, elevated slabs and platform walkway/ working area.
Dam, Fancher Creek Dam, Redbank Dam, Alluvial Drain Detention Basin, Fancher Creek Detention Basin, Pup Creek Detention Basin, Redbank Detention Basin, Dry Creek Extension Basin, Pup Enterprise Basin and various dams, embankments, storm drain pipelines, structures, pump stations, developed and undeveloped basin sites and stream channels throughout the District.
Cottonwood Creek Stormwater Detention Basin PR-2 Location Colorado Publication Date 11/20/2019 Closing Date 12/19/2019 02:00 PM MST
Indianapolis, IN SD-04-069, Holly Creek Regional Detention Basin Project Information 03/27/24 Morphey Construction
Public Bid SD-04-069 Holly Creek Regional Detention BasinRFB-14DPW-1618 Dept of Public Works Due DateMarch 28, 2024 at 10:00 AM Purchasing AgentColin O’Sullivan Colin.OSullivan@Indy.Gov317-327-2304 Range: $900,000 - $1,300,000 Pre-Bid Conference: 3/12/2024 at 11:00 A.M. local time in Room 361 of the City-County Building, 200 E.