Search results for: cso long term

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 21
  • Bronx River CSO Long Term Control Plan Project - Modification of Regulator #5

    Type : Bid Notification

    Due : 08 Mar, 2023 (14 months ago)
    Posted : 13 months ago
    Started : 21 Feb, 2023 (14 months ago)

    CSO-BXR-HP-011 Bronx River CSO Long Term Control Plan Project - Modification of Regulator #5 $ 22,658,783.00 3/8/2023

    From: New York (City)

  • BRONX RIVER CSO LONG TERM CONTROL PLAN PROJECT, CONSTRUCTION OF PARALLEL INTERCEPTOR AT REGULATOR HP13

    Type : Bid Notification

    Due : 20 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 05 Jun, 2023 (11 months ago)

    CSO-BXR-HP-009 BRONX RIVER CSO LONG TERM CONTROL PLAN PROJECT, CONSTRUCTION OF PARALLEL INTERCEPTOR AT REGULATOR HP13 $ 53,199,782.00 6/20/2023

    From: New York (City)

  • 82623B0013-BEDC CSO-BXR-HP-011 Bronx River CSO Long Term Control Plan Project - Modification of Regulator #5

    Type : Bid Notification

    Due : 09 Feb, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 09 Jan, 2023 (16 months ago)

    Description CSO-BXR-HP-011: Bronx River CSO Long Term Control Plan Project - Modification of Regulator #5.This Competitive Sealed Bid (“RFx") is being released through PASSPort, New York City’s online procurement portal. Responses to this RFx should be submitted via PASSPort.

    From: New York City (City)

  • DBE Opportunities - NYCDEP Bronx River CSO Long Term Control Plan - Modification of Regulator #5

    Type : Contract

    Due : 09 Feb, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 19 Jan, 2023 (15 months ago)

    DBE Opportunities - NYCDEP Bronx River CSO Long Term Control Plan - Modification of Regulator #5 Agency: New York State Contract Reporter Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:01/19/2023 Due Date: 02/09/2023 Ad Type:Contractor Ads

    From: New York State Contract Reporter (City)

  • BEDC - CSO-BXR-HP-009 BRONX RIVER CSO LONG TERM CONTROL PLAN PROJECT, CONSTRUCTION OF HP13

    Type : Bid Notification

    Due : 08 Jun, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 18 Apr, 2023 (12 months ago)

    This Competitive Sealed Bid (“RFx") is being released through PASSPort, New York City’s online procurement portal. Responses to this RFx should be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal at https://www1.nyc.gov/site/mocs/systems/about-go-to-passport.page and click on the “Search Funding Opportunities in PASSPort” blue box. This will take you to the Public Portal of all procurements in the PASSPort system. To quickly locate the RFx, insert the EPIN 82623B0033 into the Keywords search field. If you need assistance submitting a response, please contact MOCS Service Desk...

    From: New York (City)

  • Bid Extension: 82623B0033-BEDC - CSO-BXR-HP-009 BRONX RIVER CSO LONG TERM CONTROL PLAN PROJECT, CONSTRUCTION OF HP13

    Type : Bid Notification

    Due : 20 Jun, 2023 (10 months ago)
    Posted : 12 months ago
    Started : 01 Jun, 2023 (11 months ago)

    Description Bronx River Combined Sewer Overflow - Project Area HP-009 Microtunneling of Parallel Interceptor, construction of three connecting structures, upgrades to existing Regulator HP13, and replacement and upgrade of existing SCADA controls system for Regulator HP13 and tunnel at HP-009. Structural Work: Construction of supports of excavation, three new sewer structures, and modifications to an existing regulator structure. Civil Work: Excavation of shaft areas, site clearing and demolition including tree removals, regrading, maintenance of existing utilities, and restoration. Electrical Work: Installation of new instrumentation, SCADA enclosure, and associated conduit routing and wiring. Decommissioning of existing SCADA system. Inst...

    From: New York City (City)

  • Using Green Stormwater Infrastructure (GSI) to address Combined Sewer Overflow (CSO) Mitigation

    Type : Bid Notification

    Due : 13 Nov, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 16 Oct, 2018 (about 5 years ago)

    CSS separation is expensive and many CSO Long Term Control Plans (LTCP) could utilize GSI to infiltrate stormwater runoff before it enters CSSs, which can minimize risk of CSOs in a cost-effective manner. In addition, CSS separation projects often create new untreated stormwater discharges.

    From: Vermont (State)