Search results for: curb ramps and pedestrian

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,788
  • Unit Price Curb Ramps and Sidewalk Contract 3

    Type : Bid Notification

    Due : 15 May, 2024 (in 20 days)
    Posted : 4 hours ago
    Started : 24 Apr, 2024 (Yesterday)

    PROJECT DESCRIPTION: This project consists of performing improvements to ADA curb ramps and associated curbs and sidewalks.

    From: Seattle (City)

  • EscalonAvenue Pedestrian CrossingProject

    Type : Bid Notification

    Due : 07 May, 2024 (in 12 days)
    Posted : 20 months ago
    Started : 03 Apr, 2024 (21 days ago)

    ESCALON AVENUE PEDESTRIAN CROSSING PROJECT The project consists of removal of existing concrete curb, gutter, and sidewalk and installing two (2) ADA compliant curb ramps and a concrete median island with ADA compliant path crossing Escalon Avenue. The project also includes micro-surface seal and restriping the south project limits, upgrading a second crossing north of the median island, and additional pedestrian safety signage.

    From: Escalon (City)

  • ADA Pedestrian Curb Ramps Program FY 2018/2019 & FY 2020/2021

    Type : Bid Notification

    Due : 13 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 24 Sep, 2021 (about 2 years ago)

    ramps within the existing sidewalk and street corners.

    From: Chula Vista ()

  • Escalon Avenue Pedestrian Crossing Project

    Type : Bid Notification

    Due : 07 May, 2024 (in 12 days)
    Posted : 20 days ago
    Started : 03 Apr, 2024 (21 days ago)

    ESCALON AVENUE PEDESTRIAN CROSSING PROJECT The project consists of removal of existing concrete curb, gutter, and sidewalk and installing two (2) ADA compliant curb ramps and a concrete median island with ADA compliant path crossing Escalon Avenue. The project also includes micro-surface seal and restriping the south project limits, upgrading a second crossing north of the median island, and additional pedestrian safety signage.

    From: Escalon (City)

  • Pedestrian Curb Ramp Retrofit Program

    Type : Bid Notification

    Due : 09 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 07 Jul, 2022 (21 months ago)

    Type Invitation to Bid Status Issued Number 23-4 Addendum 1 (Pedestrian Curb Ramp Retrofit Program) Issue Date & Time 7/7/2022 10:00:00 AM (CT) Close Date & Time 8/9/2022 10:00:00 AM (CT) Time Left18 hours 49 minutes 36 seconds Notes Work will consist of the retrofitting of ADA pedestrian curb ramps in conjunction with the Street Maintenance Division’s neighborhood street resurfacing program.

    From: City of Davenport (City)

  • Pedestrian Curb Ramp Retrofit Program

    Type : Bid Notification

    Due : 09 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 07 Jul, 2022 (21 months ago)

    Type Invitation to Bid Status Issued Number 23-4 (Pedestrian Curb Ramp Retrofit Program) Issue Date & Time 7/7/2022 10:00:00 AM (CT) Close Date & Time 8/9/2022 10:00:00 AM (CT) Time Left10 days 18 hours 45 minutes 23 seconds Notes Work will consist of the retrofitting of ADA pedestrian curb ramps in conjunction with the Street Maintenance Division’s neighborhood street resurfacing program.

    From: City of Davenport (City)

  • 2024 Pedestrian Curb Ramp Retrofit Program

    Type : Bid Notification

    Due : 07 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 17 Jan, 2024 (3 months ago)

    The City of Davenport is seeking bids from qualified vendors for the 2024 Pedestrian Curb Ramp Retrofit Program. Work under this contract will consist of the retrofitting of ADA pedestrian curb ramps in conjunction with the Street Maintenance Division's neighborhood street resurfacing program.

    From: Davenport (City)