Search results for: curing system

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 77
  • Intaglio Test Press Dual UV Curing System

    Type : Bid Notification

    Due : 31 Jan, 2023 (15 months ago)
    Posted : 17 months ago
    Started : 29 Nov, 2022 (17 months ago)

    The purpose of this Amendment 0004 is to extend the due date for RFQ 2031ZAQ00366 for Intaglio Test Dual UV Curing System from 11/30/2022 to 1/31/2023 at 2:00 PM (Eastern Time). All other terms and conditions remain the same. If there will be any issue with opening attachments or other concerns about the SAM.gov, please contact SAM.gov helpdesk.

    From: Federal Government (Federal)

  • Intaglio Test Press Dual UV Curing System

    Type : Bid Notification

    Due : 31 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 06 Sep, 2022 (19 months ago)

    The purpose of this Amendment 0002 is to extend the due date of the RFQ 2031ZA22Q00366 for Intaglio Test Dual UV Curing System from 09/05/2022 to 10/31/2022 at 2:00 PM (Eastern Time).All other terms and conditions remain the same.If there will be any issue with opening attachments or other concerns about the SAM.gov, please contact SAM.gov helpdesk.

    From: Federal Government (Federal)

  • UV Curing System Retro-fit for Mini Orlof Equipment

    Type : Bid Notification

    Due : 19 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 06 Nov, 2019 (about 4 years ago)

    The BEP requests information from industry regarding UV Curing Systems.  Please see the attached notice for additional details.

    From: Federal Government (Federal)

  • MOLD, COMPOSITE REPA

    Type : Bid Notification

    Due : 31 Oct, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 19 Oct, 2022 (18 months ago)

    RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL REQUEST FOR VARIANCE (DEVIATION OR WAIVER) RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES HOT AIR CURING SYSTEM SAMPLING: THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE SPECIFIED BY THE CONTRACT.

    From: Federal Government (Federal)

  • Joint Helmet Mounted Cueing System Repair Contract

    Type : Award

    Due : 14 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 05 Oct, 2023 (6 months ago)

    This requirement is sole source to Collins Elbit Vision Systems, LLC (CEVS) (Cage Code 6VSE4).This is for an Indefinite Delivery, firm-fixed price, 3 year requirements type (Basic Contract Period Plus 2 12-month Option Periods) contract for the repairs related to Joint Helmet Mounted Curing System (JHMCS) end item hardware.Authority for requirement is 10 USC 2304(c)(1) as implemented by FAR 6.302-1, Only One Responsible Source and No Other Supplies

    From: Federal Government (Federal)

  • Procure concrete curing and conditioning chamber system

    Type : Bid Notification

    Due : 12 Sep, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 29 Aug, 2017 (about 6 years ago)

    The Federal Highway Administration (FHWA) has a requirement to procure concrete curing and conditioning chamber system for the FHWA Turner-Fairbank Highway Research Center's (TFHRC) Concrete Laboratory.It is anticipated that the resulting award will be a Firm-Fixed-Price Purchase Order, and is being issued under FAR Part 13 as a complete small business set-aside.As indicated in the Request for Quotation (RFQ), your firm's quotation must be received

    From: Federal Government (Federal)

  • Hot Foil Machine

    Type : Bid Notification

    Due : 01 Nov, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 18 Oct, 2022 (18 months ago)

    Options for additional HF Machines, ability to die-cut and laminate a stripe over the holes, adhesive curing system with chill roller, spare parts, and for the contractor to provide testing and demonstrate materials are included.ot Foil (HF) MachineHThe Hot Foil Machine shall use Hot Stamp application methodology and have the ability to:Feed sheets from a pile in register.Have an optional ability to die-cut holes into the sheets in registration onto

    From: Federal Government (Federal)