Type : Bid Notification
CITY OF PASSAIC NOTICE TO BIDDERS Sealed Proposals will be received on TUESDAY, JUNE 21, 2022 @ 10:30 A.M. prevailing time in the Purchasing...[
CITY OF PASSAIC NOTICE TO BIDDERS Sealed Proposals will be received on TUESDAY, JUNE 21, 2022 @ 10:30 A.M. prevailing time in the Purchasing...[
iron fencing and gates at the SAFE Credit Union Convention Center (1400 J Street, Sacramento, CA 95814) as detailed in the bid document.
This scope of work comprises of the contractor to manufacture and supply:Eight (8) Each 25” tall custom cast iron machining fixture referenced in Section 2.0 IAW with the Statement of Work (SOW) and Applicable Documents - DWG_8-XL-BPT-181113-1-D.Eight (8) Each 10” tall custom cast iron machining fixture referenced in Section 2.0 IAW with the Statement of Work (SOW) and Applicable Documents - DWG_8-XL-BPT-181113-2-D.Please note: The contractor shall
The installation of the new gates will include custom single-panel wrought iron gates spanning between approximately 30 to 40 feet wide, new motors, key pads, Click2Enter devices, iron posts and concrete foundations, loop detectors, trenching and patching, traffic control, and other miscellaneous work as outlined in the plans and specifications.
Supply and install one (1) custom 10’-0” wide ornamental iron gate with overhead banner sign and two (2) 2’ L x 2’ W x 9’ T CMU columns with cement plaster finish and footing. Supply and install two (2) 24” box Trachycarpus fortunei (windmill palm) at ornamental iron gate entry location. Supply and install a 192 S.F. pad of 4” thick concrete with short fibers at the ornamental iron gate location.
Bid Number:2024-28 Bid Title:Purchase of Ductile Iron Pipe and Fittings Category:Bid PostingsStatus:Open Description: Purchase of Ductile Iron Pipe and Fittings Publication Date/Time: 4/11/2024 11:00 AM Publication Information: www.projectdog.com reference project code 861010 Closing Date/Time: 5/2/2024 11:00 AM Submittal Information: submit to
The old metal sub frame of these stairs is comprised of 3” channel iron which has been custom fit to each step and welded together. Each step is supported by multiple rebar supports which have been driven down to and into bedrock. These metal sub frames will need to be removed without causing extensive damage to the rebar supports. Project Contact: Ryland Richards (563) 659-7269