Search results for: custom water tunnel system

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 40
  • Custom Water Tunnel System

    Type : Bid Notification

    Due : 16 Sep, 2022 (19 months ago)
    Posted : 19 months ago
    Started : 06 Sep, 2022 (19 months ago)

    Iowa State University of Science and Technology (ISU) is soliciting bids on behalf of the Mechanical Engineering Department for a customized Water Tunnel System. This water tunnel system will be the core experiment facility for research on underwater propulsion and robotic system developments.

    From: Iowa State University (Higher Education)

  • Installation of Transfer Switches at District Water Control Structures

    Type : Bid Notification

    Due : 09 May, 2024 (in 11 days)
    Posted : 8 days ago
    Started : 16 Apr, 2024 (11 days ago)

    The objective of this project is to have a licensed, qualified, experienced electrical contractor knowledgeable in water control structures (pumps, gates, motors, etc.) to remove and install District supplied automatic transfer switches at ......Show More

    From: St. Johns River Water Management District (Other)

  • Water Treatment Facility Pipe Loop

    Type : Bid Notification

    Due : 26 Apr, 2024 (Yesterday)
    Posted : 7 days ago
    Started : 19 Apr, 2024 (8 days ago)

    If the valve fails, the GAC vessel will drain completely causing overflow issues to the clear well below.The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to add a pipe loop to the effluent line as necessary to stop the flow of water once the granular activated carbon (GAC) system has been turned off at the control panel.

    From: Federal Government (Federal)

  • ELECTRIC/WATER/SEWER

    Type : Contract

    Due : 30 Dec, 2027 (in about 3 years)
    Posted : 16 months ago
    Started : 27 Dec, 2022 (16 months ago)

    ELECTRIC/WATER/SEWER Solicitation ID/Procurement Identifier: 140A2323P0035 Ultimate Completion Date: Thu Dec 30 18:00:00 GMT 2027

    From: Federal Procurement Data System (Federal)

  • Purified Water System Service

    Type : Contract

    Due : 30 Sep, 2031 (in about 7 years)
    Posted : 20 months ago
    Started : 08 Aug, 2022 (20 months ago)

    Sep-24 1070701 College of Medicine Howard Shell 460-6046 Purified Water System Service Evoqua Water Technologies 9/30/31

    From: University Of South Alabama (Higher Education)

  • Purified Water System Service

    Type : Contract

    Due : 30 Sep, 2031 (in about 7 years)
    Posted : 11 months ago
    Started : 14 May, 2023 (11 months ago)

    Sep-23 1070701 College of Medicine Howard Shell 460-6046 Purified Water System Service Evoqua Water Technologies 9/30/31

    From: University Of South Alabama (Higher Education)

  • Allegheny River Tunnel Final Design

    Type : Bid Notification

    Due : 12 Apr, 2024 (15 days ago)
    Posted : 2 months ago
    Started : 28 Mar, 2024 (1 month ago)

    The ART FDC will perform final design for the ART and the associated conveyance systems, excluding the near surface facilities associated with point of connections A-72 through A-78. The final designer will work closely with the Tunnel Program Manager Consultant (TPMC) and ART-NSF6 FDC to coordinate connections to the ORT, ART-NSF6 facilities at A-72, and future connection with the Monongahela River Tunnel (MRT).

    From: Allegheny County Sanitary Authority (County)