Search results for: cutoff wall

Refine your Search
Apply several filters to get precise search results

People also searched for

works and cutoff wall
Showing opportunity 1 - 7 of 7
  • Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall Project

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 3 days)
    Posted : 12 days ago
    Started : 22 Apr, 2024 (3 days ago)

    : A new and complete 1,640 feet + long, 2 feet minimum thick, concrete cutoff wall through the embankment and into the foundation rock.

    From: Federal Government (Federal)

  • Mud Mountain Dam Lower Cascade Creek Water Control Facility

    Type : Bid Notification

    Due : 22 May, 2024 (in 26 days)
    Posted : 2 days ago
    Started : 22 Apr, 2024 (2 days ago)

    The structural height of 427 feet is measured from the bottom of a structural depression located approximately 170 feet upstream of the cutoff wall to the new top of dam at 1,257 feet NGVD29. The dam is 1,600 feet wide at the base, 25.5 feet wide at the crest, with a design crest elevation of 1,257 feet NGVD29. A concrete seepage cutoff wall extends from the crest into bedrock in the core of the dam.

    From: Federal Government (Federal)

  • Design-Bid-Build of Three Rivers Phase 2 Hydraulic Containment Structure and Modifications to Owens Lake and LaGrues Lake Culverts, McClellan-Kerr Arkansas Rive...

    Type : Pre-Bid Notification

    Due : 08 Jul, 2024 (in 2 months)
    Posted : 5 days ago
    Started : 19 Apr, 2024 (6 days ago)

    Provide all management, tools, supplies, parts, materials, equipment, transportation, and trained labor necessary for the engineering, and construction of hydraulic structures from materials that can include, but are not limited to, soil cement, concrete, riprap constructed from rock gradations up to R7400 (see Gradation charts in appendix), sheet piling, seepage cutoff walls, culvert installation, underwater excavation and rock placement, and relocation

    From: Federal Government (Federal)

  • 2024 Purdy Mesa Flowline Replacement

    Type : Bid Notification

    Due : 21 May, 2024 (in 25 days)
    Posted : 14 days ago
    Started : 27 Mar, 2024 (29 days ago)

    Description Quantity Units Unit Price Total Price 1 103.15 Imported Bedding and Haunch Materials (Type A) (Crushed Rock) (Includes haul and disposal of unsuitable excavated material) (Includes furnishing and placement of cutoff walls every 200' per Section 103.10) 2,100.

    From: Grand Junction (City)