Type : Bid Notification
This requirement is for a Firm Fixed-Price (FFP) contract for the turn-key installation of one (1) each Computer Numerical Control (CNC) Solid State Laser Cutting System, to include: all necessary engineering and design; all necessary site preparation work, such as machine removal, excavation work, and concrete and isolation pad installation; and the supply, delivery, installation, documentation and personnel training required.