Search results for: cycle cost analysis

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 730
  • North Dakota Water Supply Project Life Cycle Cost Analysis Guidelines & Calculation Process Development

    Type : Bid Notification

    Due : 29 Aug, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 27 Jul, 2017 (about 6 years ago)

    Development of water supply project life cycle cost analysis guidelines, and development of an assessment process/platform to calculate water supply project life cycle costs.Issued:07/27/2017Status:Pending ResponseCloses:08/29/2017 03:00 PM CTQuestions Due:08/11/2017 12:00 PM CTProcurement Officer:Chad KeechAddress:14 Floor Capitol Tower 600 E Boulevard Ave Dept 012 Bismarck ND 58505-0310Telephone:701-328-2767Fax:701-328-1615TTY:711Email:

    From: North Dakota (State)

  • Notice of Intent for Sole-Source Action: Bullet Trap Life Cycle Cost Analysis

    Type : Bid Notification

    Due : 29 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 28 Sep, 2023 (7 months ago)

    The associated North American Industry Classification System (NAICS) code is 541330 with a small business size standard of $22.5M in dollars.The Government requires the purchase of the following (Estimated Quantities):1 JOB - Bullet Trap Life Cycle Cost AnalysisThe Government intends to negotiate a sole-source contract for the purchase of the services described above.

    From: Federal Government (Federal)

  • Outdoor Sport Facilities Lighting System Assessment and Rehabilitation Planning

    Type : Bid Notification

    Due : 05 Aug, 2024 (in 3 months)
    Posted : 19 days ago
    Started : 04 Aug, 2024 (in 3 months)

    The proponent will also employ predictive modeling, leveraging industry-standard asset management practices, to conduct a comprehensive life cycle cost analysis encompassing multiple strategies. They will propose various funding models to address the maintenance of existing assets and the installation of new lighting systems.

    From: Vancouver (City)

  • Bond Reimbursement and Grant Review Committee Meeting

    Type : Bid Notification

    Due : 10 Apr, 2024 (18 days ago)
    Posted : about 3 years ago
    Started : 28 Mar, 2024 (1 month ago)

    The primary topics of the meeting include review and approval of the FY2026 Capital Improvement Project application and support materials; revisions to the Program Demand Cost Model for Alaska Schools and Life Cycle Cost Analysis Handbook publications; and updates from the design ratios and school space subcommittees.

    From: Alaska (State)

  • Electric Vehicle Equipment Feasibility Study

    Type : Bid Notification

    Due : 28 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Mar, 2022 (about 2 years ago)

    This work shall include the analysis and evaluation of the existing electric utility supply capacity, solar photovoltaic (PV) power system energy production (if applicable), and existing electrical power distribution system condition, capacity, loading, and available space, along with providing recommendations, phasing, preliminary scopes of work, budgetary estimates, and life cycle cost analysis for converting 100% of the existing Department of Veterans

    From: Federal Government (Federal)

  • Teslin River and Lewes River Bridges Project: Strategic Engineering & Comprehensive Structural Analysis on Alaska Highway #1, at km 1295 and km 1393

    Type : Bid Notification

    Due : 20 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 11 Jan, 2024 (3 months ago)

    For the Teslin River Bridge, scope of work involves a complete condition assessment, including a thorough field and underwater inspection, engineering analyses, maintenance needs evaluation, development of an in-depth repair strategy for piers and a Life Cycle Cost Analysis for the entire structure.

    From: Yukon (State)

  • FAA WJHTC Building 303 Chillers Replacement Project - Chiller Selection Submission

    Type : Bid Notification

    Due : 14 Nov, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 10 Oct, 2018 (about 5 years ago)

    Submission Requirements Chiller manufacturers are requested to submit the following: (a) Completed Building 303 Chiller 2 and 3 Replacement Life Cycle Cost Analysis Worksheet (b) Other information as required in attached “Preparation of Submittals” document 4.

    From: Federal Government (Federal)