Search results for: dam site

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 16
  • Y--RG-EBHD <b>DAM</b> <b>SITE</b> ELECTRIC UTILITY REHAB-TRANSFORME

    Y--RG-EBHD DAM SITE ELECTRIC UTILITY REHAB-TRANSFORME

    Type : Award

    Due : 08 May, 2024 (in 8 days)
    Posted : 5 days ago
    Started : 23 Apr, 2024 (5 days ago)

    RG-EBHD DAM SITE ELECTRIC UTILITY REHAB-TRANSFORMERS & POLES

    From: Federal Government (Federal)

  • Site C Driver Training Services

    Type : Bid Notification

    Due : 07 May, 2024 (in 8 days)
    Posted : 10 days ago
    Started : 17 Apr, 2024 (11 days ago)

    Site C Driver Training Services Project Description :Site C – Driver Training Services to be provided at the Site C dam-site in Fort St. John, BC. A Site visit is scheduled for April 23. ...

    From: MerX (Federal)

  • Centerbrook Dam Removal and Wetland Restoration - Hyde Park

    Type : Bid Notification

    Due : 10 May, 2024 (in 11 days)
    Posted : 4 days ago
    Started : 24 Apr, 2024 (4 days ago)

    In March of 2023, a small parcel located by the Centerville Brook Dam was sold to the Town of Hyde Park. Spring of 2023 the Town of Hyde Park met with state and regional partners from the Vermont Department of Environmental Conservation, the Vermont Natural Resources Council, and the Lamoille County Planning Commission to evaluate this site for a potential dam removal and wetland restoration project.

    From: Vermont (State)

  • Strathcona Discharge Upgrade

    Type : Bid Notification

    Due : 17 Jul, 2024 (in 2 months)
    Posted : 1 month ago
    Started : 27 Mar, 2024 (1 month ago)

    The contract includes mechanical, civil, structural, geotechnical, electrical, protection and control work at Strathcona dam, that is located approximately 30 km west of the City of Campbell River.Mandatory Site Visit - BC Hydro plans to hold a mandatory site visit. Proponents should pre-register to attend the site visit.

    From: British Columbia (State)

  • Project Management Mill Remnant <b>Dam</b> Removal

    Project Management Mill Remnant Dam Removal

    Type : Contract

    Due : 21 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 15 Mar, 2024 (1 month ago)

    \\\nThe Atlantic Salmon Federation (ASF) will provide oversight for anadromous fish passage\nimprovements at the Mill Remnant Dam site Sabattus, Maine. ASF and its agents will provide\nconstruction oversight to ensure compliance with state and federal permit requirements and to\nverify that the work is done according to stamped engineering design plans. Demolition and any\nrequired bank stabilization is set for 2024.\n\n2.

    From: Maine (State)

  • ITB#23-26 - TREE MORTALITY MITIGATION PROJECT #21

    Type : Bid Notification

    Due : 20 Jun, 2024 (in 1 month)
    Posted : 3 months ago
    Started : 12 Jan, 2024 (3 months ago)

    A mandatory pre-bid meeting will be conducted on site at 9:00 a.m. on December 5, 2023 at quarry site adjacent to the Bear River dam on Bear River Road, WEATHER PERMITTING. (Participation at this meeting is required). Qualified bidders may acquire a bid package at the office of General Services Administration located at 12200 B Airport Road, Martell, CA, 95654 between the hours of 9:00 a.m. 4:45 p.m.

    From: Amador (County)

  • Composite Cap Installation over contaminated mine waste associated with the Callahan Mine Superfund Site in Brooksville, Maine

    Type : Bid Notification

    Due : 22 May, 2024 (in 23 days)
    Posted : 6 days ago
    Started : 22 Apr, 2024 (6 days ago)

    To gain access to the ore, Goose Pond was drained by constructing two dams: an earthen dam across Goose Pond (Marsh Creek) near the southern Site boundary and a concrete dam with stop logs at Goose Falls. After draining the pond, an open pit mine approximately 600 feet in diameter and 300 feet deep was excavated to access the ore.

    From: Federal Government (Federal)