Search results for: dam spillway monolith

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 11
  • Chief Joseph Dam Spillway Monolith Sealing

    Type : Bid Notification

    Due : 10 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 03 Sep, 2021 (about 2 years ago)

    Contract Title: Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, WA.The work includes drilling and installation of six water stops and incidental related work. In general, the contractor shall complete precision angle drilling within precise tolerances to inject a hydrophilic sealant into the upstream spillway monoliths at fourlocations in the overflow section and one location on the non-overflow section.

    From: Federal Government (Federal)

  • Chief Joseph Dam Spillway Monolith Sealing

    Type : Bid Notification

    Due : 19 Aug, 2022 (20 months ago)
    Posted : 23 months ago
    Started : 29 Jul, 2022 (21 months ago)

    Army Corps of Engineers, Northwestern Division, Seattle District requires work that includes drilling and installation of five water stops and incidental related work for Chief Joseph Dam.  In general, the contractor shall complete precision angle drilling within precise tolerances to inject a hydrophilic sealant into the upstream spillway monoliths at fours locations in the overflow section and one location on the non-overflow section. 

    From: Federal Government (Federal)

  • Chief Joseph Dam Spillway Sump Pump and Controls

    Type : Bid Notification

    Due : 01 Feb, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 23 Jan, 2023 (15 months ago)

    Army Corps of Engineers has a requirement to increase the spillway sump pump capacity to keep up with current spillway water intrusion at Chief Joseph Dam, Bridgeport, Washington. To increase the spillway dam sump pump capacity the existing pumps and controls will be removed and replaced along with associated piping and valves.

    From: Federal Government (Federal)

  • Chief Joseph Dam Spillway Sump Pumps and Controls

    Type : Bid Notification

    Due : 07 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 07 Jan, 2022 (about 2 years ago)

    Submit three projects that demonstrates Contractor’s ability to perform the work for Chief Joseph Dam Spillway Sump Pumps and Controls.

    From: Federal Government (Federal)

  • STORMWATER POND DAM REPAIRS

    Type : Contract

    Due : 27 Aug, 2024 (in 4 months)
    Posted : 7 months ago
    Started : 28 Aug, 2023 (7 months ago)

    STORMWATER POND DAM REPAIRS Solicitation ID/Procurement Identifier: 70US0923C70093472 Ultimate Completion Date: Tue Aug 27 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Dam Water Gates

    Type : Bid Notification

    Due : 27 Sep, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 29 Sep, 2023 (6 months ago)

    REVIEW THE ATTACHED RFQ FOR COMPLETE DETAILS0001 QUICK DAM WATER-GATE 50" X 50' Brand name or equal 2 ea 0002 QUICK DAM WATER-GATE 50" X 30' Brand name or equal 3 ea 0003 QDSCRATE Water Gate Crate Brand name or equal 1 eaA - Polyester fabric coated with super heavy-duty, abrasion resistant PVC suitable for use on all types of surfaces.B - Stretched partitions made of 100% woven polyethyleneC - Polypropylene straps to ease in handlingD - Galvanized

    From: Federal Government (Federal)

  • Z--Folsom Dam Vessel Exclusion Barrier (VEB) Storm Damage Repair

    Type : Award

    Due : 15 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 06 Jun, 2023 (10 months ago)

    Folsom Dam Vessel Exclusion Barrier (VEB) Storm Damage Repair

    From: Federal Government (Federal)