Type : Bid Notification
Marion County Asphalt Resurface & Bridge Deck Patching on I-65 &I-70 Project Information 3/27/19 Rieth-Riley Construction Co., Inc. Andrew Rayner Phone: 317-634-5561 Email: arayner@rieth-riley.com
Marion County Asphalt Resurface & Bridge Deck Patching on I-65 &I-70 Project Information 3/27/19 Rieth-Riley Construction Co., Inc. Andrew Rayner Phone: 317-634-5561 Email: arayner@rieth-riley.com
PROJECT: THE SUPPLY OF DECK PATCH FOR VARIOUS PROJECTS AROUND MANITOBA brandPreference : Brand Name Only description : MORTAR, PRE MIXED DECK PATCHING MASTEREMACO T 1061 BY BASF manufacturer : MASTREEMACO T quantity : 2,520 unitOfMeasure : Bags brandPreference : Brand Name Only description : MORTAR, PRE MIXED DECK PATCHING MASTEREMACO T 545 BY BASF manufacturer : MASTREEMACO T quantity : 2,520 unitOfMeasure : Bags brandPreference : Brand Name Only
Rehabilitation of 7 structures including shallow deck patching repairs, healer/sealer to deck, replacement of expansion joints, substructure patching repairs and approach work at 7 locations in the city of Detroit, Wayne County. ** 1414 Fa **
Proposal 73000-133003 Bridge deck patching and epoxy healer/sealer of bridge deck on Johnson Street, Court Street, Center Street and Holland Avenue over the Saginaw River, Saginaw County. This is a Local Agency Project. ** 270 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of either N4 or N9-1G.
Proposal 25000-211752 Bridge rehabilitation includes epoxy overlays, joint sealing and deck patching on Leroy Street, Caroline Street and Torrey Road in the city of Fenton, Genesee County. This is a Local Agency project. ** 249 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N7.
Description3.53 mi of bridge rehabilitation including hot mix asphalt overlay resurfacing, concrete deck patching and expansion and relief joint rehabilitation beginning at Pier 1 on the Mackinac Bridge to Pier 18 and continuing between Pier 21 on the Mackinac Bridge to Pier 48 in the village of Mackinaw City and city of St. Ignace, Emmet and Mackinac Counties.
Proposal 44000-202389 Bridge rehabilitation including epoxy healer/sealer on decks, deck patching, substructure patching and approach stabilization on 5 bridges on various routes in the city of Lapeer, Genesee County. This is a Local Agency project. ** 241 N9-1A **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa.