Search results for: decommissioning of monitoring

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 102
  • RE-BID- SMD_SERVICES_REQUIREMENTS CONTRACT FOR THE DECOMMISSIONING OF MONITORING / RECOVERY WELLS WITHIN THE FIVE BOROUGHS OF NEW YORK CITY

    Type : Bid Notification

    Due : 17 Nov, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 21 Oct, 2022 (18 months ago)

    Description The citywide decommissioning of monitoring/recovery wells as required by 6 NYCRR part 360, Environmental Conservation Law Article 23 and New York State Department of Environmental Conservation CP – 43 policy at various locations in all Five (5) Boroughs as shown in Exhibit A: Location of Wells.DECOMMISSIONING METHODS: A. The two primary well decommissioning methods are: 1. Grouting in-place. 2. Perforating overdrill. B.

    From: New York City (City)

  • Mechanic Street Landfill Repairs

    Type : Contract

    Due : 20 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 05 Sep, 2018 (about 5 years ago)

    Major repairs to capped landfill including erosion areas, swale grading, spillway widening, replacement, installation & decommissioning of monitoring wells and gas vents.

    From: Massachusetts (State)

  • Havilland Waste Disposal Site Fill Area Extension Project - Construction

    Type : Bid Notification

    Due : 26 Apr, 2023 (12 months ago)
    Posted : 12 months ago
    Started : 11 Apr, 2023 (12 months ago)

    The construction work will include tree/shrub removal, grubbing of vegetation, stumps and roots, ditching, excavation of topsoil, and grading, as well as decommissioning of 5 groundwater monitoring wells and installation of 1 replacement well. The construction work will also include excavation and onsite burying of a stand of Japanese Knotweed (an invasive shrub) located within the current fill area.

    From: Canada (Federal)

  • RFQ - S 218th St/98th Ave S from 94th Place S to S 216th St

    Type : Bid Notification

    Due : 07 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 21 Feb, 2024 (2 months ago)

    Decommissioning of 3 monitoring wells. Installation of 1,270 LF of restrained joint 12 & 18 inch water main with associated appurtenances. Installation of 1,480 LF of 6 & 8” sewer pipe and 7 manholes. 2,900 LF of new storm sewer with catch basins. Installation of a new illumination system. 3,700 LF of PSE utility trench including 9,525 LF of conduit and vault placement. 8,480 feet of permanent channelization.

    From: Washington State Office of Minority and Women (State)

  • RFQ - S 218th St/98th Ave S from 94th Place S to S 216th St

    Type : Bid Notification

    Due : 07 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 31 Jan, 2024 (2 months ago)

    Decommissioning of 3 monitoring wells. Installation of 1,270 LF of restrained joint 12 & 18 inch water main with associated appurtenances. Installation of 1,480 LF of 6 & 8” sewer pipe and 7 manholes. 2,900 LF of new storm sewer with catch basins. Installation of a new illumination system. 3,700 LF of PSE utility trench including 9,525 LF of conduit and vault placement. 8,480 feet of permanent channelization.

    From: Ben Franklin Transit (Transportation)

  • Soil Cleanup Remedial Action - Webster Nursery Site, Department of Natural Resources, Thurston County, WA

    Type : Bid Notification

    Due : 30 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 16 May, 2018 (about 6 years ago)

    monitoring wells, and installation of 2 new monitoring wells.

    From: Washington State Department of Natural Resources (State)

  • THE MEADOWAY MULTI-USE TRAIL – IMPLEMENTATION OF SECTION 3

    Type : Bid Notification

    Due : 11 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 20 Nov, 2023 (5 months ago)

    of existing monitoring wells; Removal and disposal of existing concrete within Highland Creek tributary where necessary to facilitate temporary and permanent bridge installation; Design/build for bonding/grounding system for installation of trail amenities within the existing Hydro corridor; Installation of granular base and asphalt paving of 4,285 sqm of trail including resting nodes, signage and line painting; Supply and Place Wood Guard Rail fence

    From: Toronto and Region Conservation Authority (City)