Type : Contract
IN-SITU DIMENSIONAL AND MACRO SURFACE DEFECT MITIGATIOIN IN WIRE-FED ADDITIVE MANUFACTURING PROCESSES Solicitation ID/Procurement Identifier: 80NSSC20C0388 Ultimate Completion Date: Mon Mar 01 18:00:00 GMT 2021
IN-SITU DIMENSIONAL AND MACRO SURFACE DEFECT MITIGATIOIN IN WIRE-FED ADDITIVE MANUFACTURING PROCESSES Solicitation ID/Procurement Identifier: 80NSSC20C0388 Ultimate Completion Date: Mon Mar 01 18:00:00 GMT 2021
PHASE I 2020 SBIR - TITLE : INTEGRATED PROCESS MONITORING SOFTWARE AND MULTI-SENSOR SUITE FOR IMPROVED RELIABILITY IN WIRE-FED AM Solicitation ID/Procurement Identifier: 80NSSC20C0664 Ultimate Completion Date: Mon Mar 01 18:00:00 GMT 2021
Outside Walk IN Refrigerator Make: Polar King Model: 3678-4-P Size: 8x8x8.5120/208 1 phase, max amps is 15 120/208 1 phase, max amps is 15 Outside Freezer Walk in Make: Polar King Model: L-89 Size: 8x8x8.5 120/208 1 Phase, 3 wire fed from EDP CKT 27, 29 Outside Freezer Walk in Make: Polar King Model: L89 Size: 8x8x8.5 120/208 1 Phase, 3 wire fed from EDP CKT 23, 25 Condensate Line Crowned Roof Defrost Timer Door Closer/Door Sweep Seal Exterior Hasp
As part of this mission, NETL has an immediate need for a dual wire- and powder-fed Directed Energy Deposition (DED) Additive Manufacturing (AM) machine to support research in metal additive manufacturing. The machine shall have maximum flexibility for supporting a wide range of DOE and NETL research projects and also include robust in-site processing monitoring and closed-loop control.
LTA uses proprietary fiber laser and wire fed processing techniques and control algorithms to enable the technology and provide robust joints. LTA is also the only vendor capable of this technology and has signed a Non-Disclosure Agreement (NDA) with NASA to integrate the NASA portion of the technology. The NASA developed process does not exist at any of the centers and the only vendor capable of this process is LTA.2.
Ceiling mount (2.1.2) If ceiling surface mounted with wire mold or conduit need to be run to them, or is the wire to be fed from the back? wire mold is acceptable, Ceilings in restrooms are usually drywall, ceilings in hallways and some restrooms are drop in, closets are open or drop in. (3) What are the ceiling heights in the Restroom/Locker Rooms and in the hallways?
NOTICE TO BIDDERS: RFB 23-OPS-01 Frederick Community College (FCC) is seeking bids from qualified bidders for to provide a new power supply for data racks located in the FCC Cybersecurity Lab Server Expansion by providing a new 100 amp, 208/120V, 3-phase, 4-wire, 60Hz subpanel, fed from the penthouse of Building B, mounting a suspended aluminum raceway with receptacles in the lab, and providing all feeders as shown in drawing E101 (including notes