Search results for: delivering and installing air

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 47
  • Furnishing, Delivering and Installing Air Purifiers for HSPLS

    Type : Bid Notification

    Due : 23 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 09 Jun, 2021 (about 2 years ago)

    Quantity 13 Unit of Measure EACH Title Furnishing, delivering and Installing Air Purifiers - MAUI Description Furnishing, delivering and Installing 13 Air Purifiers to Maui Libraries Quantity 10 Unit of Measure EACH Title Furnishing, Delivering and Installing Air Purifiers - KAUAI Description Furnishing, Delivering and Installing 10 Air Purifiers to various Kauai libraries.

    From: Hawaii (State)

  • B5706 - Job Order Contract for Plumbing

    Type : Bid Notification

    Due : 13 Jun, 2024 (in 1 month)
    Posted : 11 days ago
    Started : 02 Apr, 2024 (26 days ago)

    Description:The contractor shall provide all labor, material and supervision required and necessary to test, maintain, repair, modify, made addition to and/or installing heating ventilation and air conditioning systems, equipment and components. Login to the Vendor Portal (Open external link) to download BID B5625.

    From: New York City Department of Education (City)

  • BEST VALUE REQUIREMENTS CONTRACT FOR THE REPAIR OF HVAC SYSTEMS

    Type : Bid Notification

    Due : 11 Apr, 2024 (17 days ago)
    Posted : 3 months ago
    Started : 24 Jan, 2024 (3 months ago)

    Bidders should include in their notification e-mail the name of the person who will be delivering the bid or advise that the Bid Package will be arriving by messenger. Bidders who fail to provide advance notification of intent to hand-deliver a bid risk not having anyone to receive the bid.BID OPENS VIRTUALLY ON APRIL 12TH, 2024 AT 11:00 A.M.

    From: New York City (City)

  • J045--Blanket Purchase Agreement (BPA) for Plumbing /Pipefitting

    Type : Bid Notification

    Due : 15 Apr, 2024 (13 days ago)
    Posted : 18 days ago
    Started : 10 Apr, 2024 (18 days ago)

    For projects that require maintaining negative air pressure within the work area, provide an entry/exit chamber (construction vestibule) for delivering or removing materials and equipment at the worksite. Delivery and remove of materials and equipment at the worksite must be completed in a manner that maintains the specified negative air pressure within the work area at all times.

    From: Federal Government (Federal)

  • ANR-Energy Efficiency Measures-ANR Office Complex RFP

    Type : Bid Notification

    Due : 16 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 Sep, 2019 (about 4 years ago)

    This project consists of but is not limited to improving energy efficiency at the ANR/Essex Office Complex by performing air sealing and installing insulation in two office buildings. Energy Efficiency Measures Summary: Fish & Wildlife Office Building 1. Attic: a. Air seal and upgrade insulation in the flat attic b. Air seal and re-insulate the attic mechanical rooms c. Improve doors from mechanical areas to main attic 2. Basement: a.

    From: Vermont (State)

  • REBID ANR Energy Efficiency Measures at ANR Complex, Essex Junction, VT

    Type : Bid Notification

    Due : 11 Dec, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 15 Nov, 2019 (about 4 years ago)

    This project consists of but is not limited to improving energy efficiency at the ANR/Essex Office Complex by performing air sealing and installing insulation in two office buildings. Energy Efficiency Measures Summary: Fish & Wildlife Office Building 1. Attic: a. Air seal and upgrade insulation in the flat attic b. Air seal and re-insulate the attic mechanical rooms c. Improve doors from mechanical areas to main attic 2. Basement: a.

    From: Vermont (State)

  • B5730 - Removal and Transfer of Cafeteria and Kitchen Equipment

    Type : Bid Notification

    Due : N/A
    Posted : 5 days ago
    Started : 08 Apr, 2024 (20 days ago)

    Description:The contractor shall provide all labor, material and supervision required and necessary to test, maintain, repair, modify, made addition to and/or installing heating ventilation and air conditioning systems, equipment and components. Login to the Vendor Portal (Open external link) to download BID B5625.

    From: New York City Department of Education (City)