Type : Contract
MISSIONFIELD, NC - DEMOLITION AND INSTALLATION HVAC UNITS IN ACCORDANCE WITH THE SOW, SPECIFICATIONS, AND DRAWINGS. Solicitation ID/Procurement Identifier: 6973GH23C00092 Ultimate Completion Date: Fri Jul 28 17:00:00 GMT 2023
MISSIONFIELD, NC - DEMOLITION AND INSTALLATION HVAC UNITS IN ACCORDANCE WITH THE SOW, SPECIFICATIONS, AND DRAWINGS. Solicitation ID/Procurement Identifier: 6973GH23C00092 Ultimate Completion Date: Fri Jul 28 17:00:00 GMT 2023
• Demolition and disposal of chainmesh enclosure, ductwork, grilles and miscellaneous items as indicated in the contract drawings. • Provision of temporary air conditioning (portable units or other) to ED during relocation of existing main air handling unit. • Supply and installation of chilled water air handling unit with run-around coils, mechanical services control panel, air dampers, ductwork, pipework, sensors, controls and cabling for the CT
This piping will be demolished back to the main and capped. Work also includes the installation of one (1) new OFCI 40-ton water cooled unit and one (1) OFCI 30-ton water cooled unit onto existing concrete pads. Both AHU’s will be purchased by SLAC prior to Construction project. New supply and return ducts shall be provided and connected to existing ductwork in the building. VAV boxes and supply grilles shall be rebalanced as shown on plans.
Demolition of Existing Un-Functional HVAC unit at roof top Organization:City of Boston Department:311 - Public Works Department Location:311 - City Hall Bulletin Desc:Invitation for Sealed Bids for Demolition of Existing Un-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. Delivery and Installation of replacement HVAC Unit.
HVAC Systems installation 13. Some building automation 14. Major Electrical equipment installation, 15. Telecommunications systems, ** PROPOSAL# 964-24 THS Ag CTE Renovation Page 5 of 59 16. Data cabling and systems including security and Wi-Fi, ** 17. Fire detection, alarm, and emergency call systems 18.
The project w ill include the demolition of the old system and the installation of the new system including supply ducts, return ducts, dif fusers, electrical w iring, conduits, propane gas line, regulators and electric heater in the mechanical room.
Demolition of Existing UN-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. D Organization:City of Boston Department:311 - Public Works Department Location:311 - City Hall Bulletin Desc:Demolition of Existing UN-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. Delivery and Installation of replacement HVAC unit.