Search results for: demolition and installation hvac

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 553
  • MISSIONFIELD, NC - DEMOLITION AND INSTALLATION HVAC UNITS IN ACCORDANCE WITH THE SOW, SPECIFICATIONS, AND DRAWINGS.

    Type : Contract

    Due : 28 Jul, 2023 (9 months ago)
    Posted : 12 months ago
    Started : 17 Apr, 2023 (12 months ago)

    MISSIONFIELD, NC - DEMOLITION AND INSTALLATION HVAC UNITS IN ACCORDANCE WITH THE SOW, SPECIFICATIONS, AND DRAWINGS. Solicitation ID/Procurement Identifier: 6973GH23C00092 Ultimate Completion Date: Fri Jul 28 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • Katherine Hospital - Supply Delivery <b>Installation</b> and Commissioning of Mould Remediation <b>HVAC</b> Upgrades

    Katherine Hospital - Supply Delivery Installation and Commissioning of Mould Remediation HVAC Upgrades

    Type : Bid Notification

    Due : 01 May, 2024 (Today)
    Posted : 14 days ago
    Started : 01 May, 2024 (Today)

    Demolition and disposal of chainmesh enclosure, ductwork, grilles and miscellaneous items as indicated in the contract drawings. • Provision of temporary air conditioning (portable units or other) to ED during relocation of existing main air handling unit. • Supply and installation of chilled water air handling unit with run-around coils, mechanical services control panel, air dampers, ductwork, pipework, sensors, controls and cabling for the CT

    From: Northern Territory Government of Australia (State)

  • Demolition and Installation of HVAC Units

    Type : Bid Notification

    Due : 10 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 27 Mar, 2018 (about 6 years ago)

    This piping will be demolished back to the main and capped. Work also includes the installation of one (1) new OFCI 40-ton water cooled unit and one (1) OFCI 30-ton water cooled unit onto existing concrete pads. Both AHU’s will be purchased by SLAC prior to Construction project. New supply and return ducts shall be provided and connected to existing ductwork in the building. VAV boxes and supply grilles shall be rebalanced as shown on plans.

    From: Federal Government (Federal)

  • Demolition of Existing Un-Functional HVAC unit at roof top

    Type : Bid Notification

    Due : 12 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 24 Feb, 2020 (about 4 years ago)

    Demolition of Existing Un-Functional HVAC unit at roof top Organization:City of Boston Department:311 - Public Works Department Location:311 - City Hall Bulletin Desc:Invitation for Sealed Bids for Demolition of Existing Un-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. Delivery and Installation of replacement HVAC Unit.

    From: Massachusetts (State)

  • Tomball High School CTE Renovation Bid Packet

    Type : Bid Notification

    Due : 29 Jul, 2024 (in 2 months)
    Posted : 3 months ago
    Started : 04 Jan, 2024 (3 months ago)

    HVAC Systems installation 13. Some building automation 14. Major Electrical equipment installation, 15. Telecommunications systems, ** PROPOSAL# 964-24 THS Ag CTE Renovation Page 5 of 59 16. Data cabling and systems including security and Wi-Fi, ** 17. Fire detection, alarm, and emergency call systems 18.

    From: Tomball Independent School District (School)

  • HVAC Installation

    Type : Bid Notification

    Due : 02 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 24 Feb, 2021 (about 3 years ago)

    The project w ill include the demolition of the old system and the installation of the new system including supply ducts, return ducts, dif fusers, electrical w iring, conduits, propane gas line, regulators and electric heater in the mechanical room.

    From: Federal Government (Federal)

  • Demolition of Existing UN-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. D

    Type : Bid Notification

    Due : 12 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 24 Feb, 2020 (about 4 years ago)

    Demolition of Existing UN-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. D Organization:City of Boston Department:311 - Public Works Department Location:311 - City Hall Bulletin Desc:Demolition of Existing UN-Functional HVAC unit at roof top of 400 Frontage Road, Boston, MA 02118. Delivery and Installation of replacement HVAC unit.

    From: Massachusetts (State)