Type : Bid Notification
Due : 23 Aug, 2022 (20 months ago)
Posted : 23 months ago
Started : 06 Jun, 2022 (23 months ago)
Facility Intake Connection Improvements Phase 2 Project.
Facility Intake Connection Improvements Phase 2 Project.
Evaluate engineering feasibility of a seawater desalination facility and determine its optimum location in the South Bay with minimum 10 million gallons per day (MGD) and maximum 40 MGD production capacity for drinking water supply and develop a concept level setting for the facility. B. Determine feasible treatment processes for a future desalination facility including intake location(s) and brine management options.