Search results for: design and buildout

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 528
  • ACC TRANSPLANT BUILDOUT - DESIGN

    Type : Bid Notification

    Due : 13 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Jul, 2021 (about 2 years ago)

    TRANSPLANT BUILDOUT - DESIGN University Project Number 22520 Construction Budget:  $ 3,392,938.00   The University’s standard RFP has been substantially modified

    From: Utah (State)

  • Refuge Station Buildout - Design and Build

    Type : Bid Notification

    Due : 14 Aug, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 28 Jul, 2020 (about 3 years ago)

    inch diameter duct)FiberCopper (Telephones, Public address)CalculationsQuality Inspection PlansSpecification(s)Bill-of-Material – including the identification of long-lead itemsWalk DownsDiscovery and Existing Drawing reviewsTie-ins to existing systemsTie-in to the underground buildout phaseTrenching30%, 60%, 90% Design ReviewsIssue 100% for construction documentsMSTS Submittal process for review of subcontract documentsA preliminary draft Design

    From: Federal Government (Federal)

  • Refuge Station Buildout - Design and Build

    Type : Bid Notification

    Due : 14 Aug, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 28 Jul, 2020 (about 3 years ago)

    inch diameter duct)FiberCopper (Telephones, Public address)CalculationsQuality Inspection PlansSpecification(s)Bill-of-Material – including the identification of long-lead itemsWalk DownsDiscovery and Existing Drawing reviewsTie-ins to existing systemsTie-in to the underground buildout phaseTrenching30%, 60%, 90% Design ReviewsIssue 100% for construction documentsMSTS Submittal process for review of subcontract documentsA preliminary draft Design

    From: Federal Government (Federal)

  • CROCKER SCIENCE CENTER 3RD FLOOR BUILDOUT - DESIGN

    Type : Bid Notification

    Due : 23 Jan, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 31 Dec, 2019 (about 4 years ago)

    :   CROCKER SCIENCE CENTER 3RD FLOOR BUILDOUT - DESIGN University Project Number 22350 Construction Budget:  $ 7,500,000.00   The University’s standard RFP has been substantially modified

    From: Utah (State)

  • THE TASK ORDER IS FOR THE DESIGN SERVICES OF THE UNITED STATES ATTORNEYS OFFICE OFFICE BUILDOUT 3RD FLOOR AT 1100 COMMERCE STREET, DALLAS TEXAS.

    Type : Contract

    Due : 05 Sep, 2024 (in 4 months)
    Posted : 2 months ago
    Started : 26 Feb, 2024 (2 months ago)

    THE TASK ORDER IS FOR THE DESIGN SERVICES OF THE UNITED STATES ATTORNEYS OFFICE OFFICE BUILDOUT 3RD FLOOR AT 1100 COMMERCE STREET, DALLAS TEXAS. Solicitation ID/Procurement Identifier: 47PH0624R0008 Ultimate Completion Date: Thu Sep 05 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Ross Dry Office Remodel for LBNF/DUNE-US Project

    Type : Bid Notification

    Due : 03 May, 2024 (in 4 days)
    Posted : 10 days ago
    Started : 17 Apr, 2024 (11 days ago)

    and finishing- Painting, staining, and finishing- Data pathways provided, network infrastructure by othersSubcontractor shall provide design-build services including cost-saving alternatives.

    From: Federal Government (Federal)

  • IFB SPEC 8684 Allegheny County Health Department Clinic Design Van Buildout

    Type : Bid Notification

    Due : 09 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 17 Feb, 2022 (about 2 years ago)

    Mechanical and Electrical Repair and Maintenance US_NAICS_2017 811118 Other Automotive Mechanical and Electrical Repair and Maintenance

    From: Allegheny (County)