Type : Bid Notification
Review the A/E Design Team’s and the Owner’s Design Intent, Design Criteria and Commissioning Requirements to develop the Project Objectives Document. 1.5.3. Develop a Commissioning Plan encompassing the four (4) phases outlined above in 1.3. 1.4.4.Review commissioning specifications for all commissioned equipment. Coordinate this with the A/E design team and Owner.