Search results for: designer and video production

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 80
  • Graphic Designer and Video Production

    Type : Bid Notification

    Due : 19 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 08 Mar, 2023 (13 months ago)

    Guid=f6c51a13-012c-1b64-1824-39c2ed490000 Commodity Code: T002A Expositions, Design and Fabrication Services T002AJ Graphic Design and Exhibit Design T002AJA Graphic Design Services T002GA Website communications consultation and design T002GJ Design of graphics for internet application T005A Graphic Design Services - including website T014N1 Graphic Design and Production T014R1D General Production (Design Consultation and Newspaper Design) T014R1R

    From: Delta (City)

  • Audio/Video Production Needs

    Type : Bid Notification

    Due : 06 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 26 Feb, 2023 (14 months ago)

    ITEMIZED NEEDS • PTZ (pan-tilt-zoom) cameras - 3 or 4 cameras needed in Council Chambers • Video switcher (hardware or software-based) in Control Room • Audio mixer (hardware or software-based) in Control Room to allow staff to mix a mic feeds from the Council Chambers • CG (character generator) for graphics to overlay on video output • Remote meeting capabilities (Zoom, Teams, etc) output integrated as an input to the video switcher • PowerPoint/

    From: Haltom (City)

  • eLearning CTL Innovations Lab Production Studio

    Type : Bid Notification

    Due : 25 Jul, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 08 Jul, 2022 (22 months ago)

    The new co-location shall include hoteling spaces, multifunction workstations, maker spaces, conferences rooms, private offices, as well as production studio, lounge, flex, storage and locker spaces. The selected design team will serve as Architect/Engineer (A/E), and shall have extensive experience in State of Ohio public Design-Bid-Build (DBB) projects.

    From: Ohio Facilities Construction Commission (State)

  • eLearning CTL Innovations Lab Production Studio

    Type : Bid Notification

    Due : 25 Jul, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 08 Jul, 2022 (22 months ago)

    The new co-location shall include hoteling spaces, multifunction workstations, maker spaces, conferences rooms, private offices, as well as production studio, lounge, flex, storage and locker spaces. The selected design team will serve as Architect/Engineer (A/E), and shall have extensive experience in State of Ohio public Design-Bid-Build (DBB) projects.

    From: Ohio Facilities Construction Commission (State)

  • As-Needed Marketing Support Services: Photography, Video Production, Graphic Design, Writing, and Web Content Optimization/Accessibi...

    Type : Bid Notification

    Due : 12 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 20 Aug, 2021 (about 2 years ago)

    STATE OF NORTH CAROLINA University of North Carolina at Wilmington (UNCW) Request for Proposal #: 72-PCWP22016 As-Needed Marketing Support Services: Photography, Video Production, Graphic Design, Writing, and Web Content Optimization/Accessibility Date of Issue: 08/20/2021 Proposal Opening: 10/01/2021 At 11:00 AM ET Direct all inquiries concerning this RFP to: Carol Page Assistant Director, UNCW Purchasing Services Email:

    From: University of North Carolina Wilmington (Higher Education)

  • DEVELOPMENT OF A LEARNING MANAGEMENT SYSTEM OR LEARNING EXPERIENCE PLATFORM

    Type : Bid Notification

    Due : 24 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 04 Aug, 2023 (8 months ago)

    Recruit instructional designers/ content developers (including video production) to assist in the development and implementation of an equity, diversity, inclusivity and accessibility (EDIA)-centered digital learning platform and 3 modules (in French and English). 2.

    From: MerX (Federal)

  • VOA Persian Special Event Programming

    Type : Bid Notification

    Due : 07 Jan, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 28 Dec, 2018 (about 5 years ago)

    The contractor shall provide all services and materials necessary to plan, organize, facilitate, manage and host the 2019 Nowruz Concert.The Contractor shall provide all personnel in connection with the concert planning, facilitation, management, conduct, and hosting including but not limited to, scheduling and administrative, camera, lighting, audio personnel, marketing, graphic artists, post-production editors, finishing editors, graphic designers

    From: Federal Government (Federal)