Type : Contract
Secondary Digester Cover and Odor Control Agency: Long Beach, City of Category:Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction Issue Date:11/21/2022 Due Date: 12/08/2022 Ad Type:General
Secondary Digester Cover and Odor Control Agency: Long Beach, City of Category:Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction Issue Date:11/21/2022 Due Date: 12/08/2022 Ad Type:General
WW-647R Biosolids Digester Facilities Project Southeast Water Pollution Control Plant San Francisco Public Utilities Commission City and County of San Francisco Project DescriptionThe Biosolids Digester Facilities Project (BDFP) aims to replace the existing digester facilities with new, expanded, reliable, modern facilities as well as improving odor control systems and upstream and downstream process systems.
Odor control— A n odor-scrubbing tow er and odor-containing solids truck-loading station help m inim ize odors. Th e truck-loading station is equipped w ith a vacuum system to trap odors that m ight escape w hen tanker trucks are being filled w ith partially treated solids destined for further treatm ent at the C entral Treatm ent Plant. Noise control— A coustic noise reduction panels are located in buildings throughout the plant.
Publication Date/Time: 4/22/2024 12:00 AM Closing Date/Time: Open Until Contracted Related Documents: CON-2023-26 Instruction to Bidders and Bid Forms CON-2023-26 Digester 2 Cleaning Attachments - 2.0 Drawings and Maps Return To Main Bid Postings Page