Type : Bid Notification
Related Documents: 2022-419 - WWTP Digester Gas Piping Bid Notice Return To Main Bid Postings Page
Related Documents: 2022-419 - WWTP Digester Gas Piping Bid Notice Return To Main Bid Postings Page
and replace the floating gasholder cover complete with pressure relief valves, flame arrestors, access manholes and associated appurtenances on Secondary Digester B, remove and replace various sizes of plug valves in the Digester Pump Station building including pneumatic actuators, modify piping, tank penetrations, and additional plug valves for future improvements, and modify the digester gas piping for Digester B and other work as indicated in
chillers, two siloxane removal tanks, and one volatile organic compound (VOC) removal tank; modifications to the Digester Control Building 3 including new building entrances, new electrical room and stairwell entrance; rehabilitation of three steam boilers including new condensate return system, new controls, and new tubes; replacement of entire plant digester gas piping system; replacement of waste gas burners; new construction management facilities
Biogas Chiller & Piping Upgrades Project Description :The intent of this bid call is to obtain an offer to perform required work involving the supply of all labour, equipment, materials and supervision as required to complete the Work of this Contract comprised of general construction required for the replacement of the biogas chiller system and digester gas room piping upgrades at the Wastewater Treatment Plant, located near Fort Saskatchewan, Alberta
Description The Town is seeking a Contractor to replace a portion of the Secondary Digester Overhead Methane Gas Piping at the Wallingford Water Pollution Control Facility. Number 23-045 Title Methane Gas Piping Replacement Available Date 10/20/2023 3:30 PM Clarification Deadline 11/8/2023 5:00 PM Due Date 12/6/2023 2:00 PM Contact Information Glen Masewicz, Buyer; 203-294-2115
This project consists of the construction of a new anaerobic digester roof. This includes installation of new recirculation and digester gas piping,temperature probes and the new manufactured cover along with new concrete confers and coating of necessary piping and materials.
Install new underground gas piping between the gas service and connection on the flare pad for pilot assembly. 5. Cut, extend, and modify existing concrete pad at waste gas burner flare. Furnish and install bollards as shown. 6. Disconnect, relocate, and re-connect all control wiring as shown to complete installation of new piping. 7.