Type : Bid Notification
The purpose of this notice is to post the official solicitation for the Overhaul/Upgrade of the Multi-Functional Display Unit for the UH-60. Please see the attachments for further details.
The purpose of this notice is to post the official solicitation for the Overhaul/Upgrade of the Multi-Functional Display Unit for the UH-60. Please see the attachments for further details.
The intent of this contract is to provide Single Engine Airtanker (SEAT) Flight Services for the Bureau of Land Management (BLM), Bureau of Indian Affairs (BIA), United States Forest Service (USFS) and other federal and state agencies as needed for the suppression of wildland fires.
OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 25 PAGES SPE4A5-24-T-165S SECTION B PR: 7006686560 NSN/MATERIAL:1560003071807 ITEM DESCRIPTION SCOOP,FLIGHT DECK SCOOP, AIR RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:
The United States Air Force through Air Force Sustainment Center (AFSC) intends to procure the line items cited below through a firm-fixed-price (FFP), Multi-Year type contract (Base and 4 Options). The Government also intends to award to a single source as this source is the only responsible source capable of repair. It is not possible for the Government to qualify additional sources at this time.
Trailer-mounted and completely self-contained Shall not require an air-return from the aircraft. Carbon Monoxide shall not be present in the output airflow of the unit in any operational mode. D. Items to be Included at no charge with the units: Two (2) complete CD Rom manuals Two (2) printed operation manuals.
Navy SSP-owned Flight Test Instrumentation (FTI) systems operated in support of SSP Trident II Flight Tests. SSP requires maintenance, operation, sustainment, logistics support and life cycle management for the FTI systems to ensure the highest availability and maximum data collected during flight tests.
This will be a Firm Fixed Price Requirements Repair contract for repair the C-130 Electronic Flight Indicator (EFI) and the Radar Display Unit (RDU). There will be a Basic Contract Period with Four (4) Ordering Periods.