Search results for: diversion erosion

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 105
  • English Coulee Diversion Erosion Repairs

    Type : Bid Notification

    Due : 19 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 28 Jul, 2021 (about 2 years ago)

    Department:Engineering Category:Sealed Bids, Miscellaneous Other Project RFP Number:8373 Start Date:07/28/2021 Close Date:08/19/2021 2:00 PM

    From: Grand Forks (City)

  • Preservation response to stabilize various bridges from scour

    Type : Bid Notification

    Due : 27 Apr, 2023 (12 months ago)
    Posted : 12 months ago
    Started : 12 Apr, 2023 (12 months ago)

    FINAL WETLAND IMPACT REPORT U 1.00\n\n645.73 FINAL STREAM DIVERSION AND EROSION CONTROL U 0.36\nPLAN\n\n645.731 MONITORING FSD&EC PLAN HR 16.00\n\n646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 910.00\n\n647.1 HUMUS CcY 90.00\n\n650.201 LANDSCAPING U 1.00\n\n692.

    From: New Hampshire Department of Transportation (Transportation)

  • SR16 & SR302 Purdy Creek

    Type : Bid Notification

    Due : 26 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 11 Jan, 2022 (about 2 years ago)

    The Work includes temporary stream diversion systems, erosion control, dewatering, clearing, clearing & grubbing, tree removal, structure and channel excavation, construction of temporary SR 16 crossover, temporary SR 302 (SPUR) detour, temporary and permanent illumination system, temporary shoring, temporary drainage, removing the existing SR 16 culvert, removing portion of SR 302 (SPUR) culvert, constructing three bridges supported by drilled

    From: Washington State Office of Minority and Women (State)

  • SR 302, Victor Creek - Remove Fish Barrier

    Type : Bid Notification

    Due : 13 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 22 Feb, 2024 (2 months ago)

    Subcontractor/Supplier Opportunities Include (but are not limited to): The work includes a temporary stream diversion system, erosion control, dewatering, clearing and grubbing, tree removal, structure and channel excavation, construction of a temporary traffic bypass including a 30’ bridge, temporary illumination system, temporary drainage, removing existing culverts, installation of one concrete bridge structure, traffic barrier, bridge railing,

    From: Washington State Office of Minority and Women (State)

  • SR 302, Victor Creek - Remove Fish Barrier

    Type : Bid Notification

    Due : 13 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 23 Feb, 2024 (2 months ago)

    Subcontractor/Supplier Opportunities Include (but are not limited to): The work includes a temporary stream diversion system, erosion control, dewatering, clearing and grubbing, tree removal, structure and channel excavation, construction of a temporary traffic bypass including a 30’ bridge, temporary illumination system, temporary drainage, removing existing culverts, installation of one concrete bridge structure, traffic barrier, bridge railing,

    From: Ben Franklin Transit (Transportation)

  • YATESVILLE BOROUGH FLOOD CONTROL PROJECT

    Type : Bid Notification

    Due : 14 Oct, 2022 (18 months ago)
    Posted : 21 months ago
    Started : 05 Aug, 2022 (21 months ago)

    The Project consists of the construction of riprap along the creek; removal of debris from the creek bed; installation of a concrete block wall along the creek; construction of concrete headwall, grading, construction of inlets and storm drainage piping, and associated care and diversion of water and erosion and sedimentation control measures. Contact Information

    From: Pennsylvania (State)

  • Abel Creek Culvert Replacement

    Type : Bid Notification

    Due : 19 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 22 Nov, 2022 (17 months ago)

    . - Instream works including creek diversion, erosion sediment control, re-establishment of creek bed around the culvert and roadway

    From: MerX (Federal)