Search results for: dock

Showing opportunity 1 - 10 of 561
  • Move and repair dock

    Type : Bid Notification

    Due : 01 Apr, 2024 (in 4 days)
    Posted : 13 days ago
    Started : 14 Mar, 2024 (13 days ago)

    The contractor shall remove old dock pilings, metal roofing, and damaged support beams. All removed/scrap material shall be placed at designated location located in the West Compound area. The contractor shall re-position the dock.

    From: Federal Government (Federal)

  • Bookstore Loading Dock Project CSUSTRFP20112

    Type : Bid Notification

    Due : 04 Apr, 2024 (in 7 days)
    Posted : 26 days ago
    Started : 28 Feb, 2024 (28 days ago)

    In general, the scope of work consists of the design and construction, under a procedure more commonly referred to as ¿turnkey construction,¿ a Design Build project, known as Bookstore Loading Dock project. The successful proposer will be required to design, supply and install a mechanical loading dock on the proposed site, as prescribed.

    From: California (State)

  • Dock Replacement

    Type : Bid Notification

    Due : 02 May, 2024 (in 1 month)
    Posted : 7 hours ago
    Started : 27 Mar, 2024 (Yesterday)

    SOLICITATION NOTICE: The National Park Service, Interior Regions 3/4/5, Ohio Major Acquisition Buying Office, intends to issue an Invitation for Bid (IFB) for the Dock Replacement project for Apostle Islands National Lakeshore (APIS) in Bayfield, WI. Work consists of providing all labor, materials, tools and other equipment necessary for removal/demolition of existing dock and install new dock. We anticipate that work would begin in May 2024.

    From: Federal Government (Federal)

  • Floating Fishing Dock for Heartland Park Lake

    Type : Bid Notification

    Due : 15 Apr, 2024 (in 18 days)
    Posted : 1 day ago
    Started : 26 Mar, 2024 (2 days ago)

    KB Breakdown of Lump Sum Bid #24-026.xlsx (please login to view this document) Exhibit C: spreadsheet for breakdown of Lump Sum Bid Price12 KB Map - Dock Location.pdf (please login to view this document) Map of Dock Location4.44 MB TOPO Map.jpg (please login to view this document) Topographical Map of Lake206 KB example drawing.jpg (please login to view this document) Example drawing of dock for informational purposes47 KB

    From: Wentzville (City)

  • GAOA COVE REC SITE DOCK REPLACEMENT

    Type : Bid Notification

    Due : 03 Apr, 2024 (in 6 days)
    Posted : 22 days ago
    Started : 05 Mar, 2024 (22 days ago)

    GAOA COVE REC SITE DOCK REPLACEMENT MATERIALS

    From: Federal Government (Federal)

  • MRO Hangar 2 Loading Dock Repair

    Type : Bid Notification

    Due : 17 Apr, 2024 (in 20 days)
    Posted : 5 days ago
    Started : 21 Mar, 2024 (6 days ago)

    MRO Hangar 2 Loading Dock Repair postdate:- 21-Mar-2024 1:30:00 PM CDT responsedate:- 17-Apr-2024 2:30:00 PM CDT ( 21d, 12h+ ) description:- As stated in specifications.

    From: Pensacola (City)

  • Dry Dock and Workforce Capabilities - Shipyards

    Type : Bid Notification

    Due : 03 Apr, 2024 (in 6 days)
    Posted : 23 days ago
    Started : 04 Mar, 2024 (23 days ago)

    See full RFI for USCG's Dry Dock and Workforce Capabilities for Shipyards in attachments

    From: Federal Government (Federal)