Type : Bid Notification
distribution systems in Buildings 1 and 12 for Project # 668-22-106 Correct Domestic Water System Building 1 and 12 at the Mann-Grandstaff VA Medical Center in Spokane, Washington.
distribution systems in Buildings 1 and 12 for Project # 668-22-106 Correct Domestic Water System Building 1 and 12 at the Mann-Grandstaff VA Medical Center in Spokane, Washington.
Portland, OR 97232 is issuing a Request for Proposal for one firm fixed price construction contract for Domestic Water System Rehabilitation at Abernathy Fish Technology Center. The magnitude of this project is between $500,000 and $1,000,000 The NAICS code for this acquisition is 237110 and the small business size standard is $39.5 Million.
document Electronic Auctions: Not Applicable Language for Bid Submissions: English unless specified in the bid document Submission Type: Online Submissions Only Submission Address: Online Submissions Only Public Opening: No Description: Portions of the domestic water system require replacement including the domestic water heaters, main hot and cold ductile iron water supply piping and the piping system requires flushing and water testing.
Arborg District Health Centre and PCH - Domestic Water System Upgrade Project Description :Projects 4314 and 4664 consist of a domestic water piping replacement within Arborg District Health Centre. Project 4142 consists of a water conditioner replacement and relocation of the Arborg Personal Care Homes domestic hot-water plant.
Water System Site Improvements, Roofing Replacement, Interior Repainting, Washroom & Domestic Water System Upgrades Sunset Park P.S. – North Bay, ON The Near North District School Board invites qualified vendors to submit tenders for the above project.
22-522 - Domestic Water System Improvements Westchester County Airport, Rye, N.Y. postdate:- 12/09/2022 responsedate:- 01/11/2023 11:00 AM EST Solicitation Number:- 22-522 to solicitation details & future business opportunities.
Project is also to include documenting and replacing the existing domestic water system and shall be properly labeled and have flow direction arrows. Selected A/E shall have no more than one hundred and eighty (180) days to complete the design and prepare a construction package. EXISTING CONDITIONS The vast majority of the sprinkler and domestic water system are piped with galvanized piping that is in poor shop.