Type : Bid Notification
Publishing Dates: February 16 & 21, 2023 ADVERTISEMENT FOR BIDS Notice is hereby given that the City of Yankton, South Dakota, will receive bids for the Douglas Avenue Reconstruction from Levee Street to 2 nd Street.
Publishing Dates: February 16 & 21, 2023 ADVERTISEMENT FOR BIDS Notice is hereby given that the City of Yankton, South Dakota, will receive bids for the Douglas Avenue Reconstruction from Levee Street to 2 nd Street.
Publishing Dates: March 22 & 24, 2022 ADVERTISEMENT FOR BIDS Notice is hereby given that the City of Yankton, South Dakota, will receive bids for the West City Limits Road, Summit Street & Douglas Avenue Street Reconstruction.
Vincent Street South to Monteith Avenue. Work is to be completed during the adjacent school’s (St. Joesph’s) closure between July 2, 2024, and September 3, 2024. The Reconstruction activities primarily relate to the improving of roadway drainage and additional watermain installation. Improving intersection turning and pedestrian crossing at Monteith. New sidewalks and curb shall be installed where indicated on the plans.
Phase 2 - Road Reconstruction Bid Status: Open Published Date: Tue Apr 30, 2024 4:00:00 PM (EDT) Bid Closing Date: Thu May 23, 2024 2:00:00 PM (EDT) Question Deadline: Fri May 17, 2024 2:00:00 PM (EDT) Electronic Auctions: Not Applicable Language for Bid Submissions: English unless specified in the bid document Submission Type: Online Submissions Only Submission Address: Online Submissions Only Public Opening: No Description: The Corporation of the
Description: Reconstruction of Bailey Road and Hooper Road from SH 78 to Sachse Road. Reconstruct the existing two-lane asphalt road with a bar-ditch section to a new two-lane concrete street with a curb and gutter section. Underground drainage system to be included. Water and sewer utilities will be upgraded with this project. Proposed sidewalk and trail along both sides of the new roadway.
HMAC shall be placed in 2 – 2-inch lifts for reconstructions. Supporting Documents Bid documents (5 MB) Addendum No. 1 (231 KB) addendum_no._2.pdf (47 KB)
Completion Date:Oct. 4, 2024 Description: Project Category Code:Concrete Walkway, ADA Curb Ramps, Traffic Control Devices (Signals, Signing, etc.), Curbs, Water Main (Repair/Replace) Rehabilitation, Stormwater Improvements, Street/Roadway Reconstruction Solicitor Details Solicitor Name:Bemidji MN, City ofDesign Discipline:City EngineerAddress:1351 5th Street NW, Bemidji, MN - 56601 Phone:218-333-1856Fax:218-333-3724Contact:Jenna RobertsEmail: