Type : Contract
Village of Piermont DPW Roll Off Conversion Bid Specs Agency: Piermont, Village of Category:Vehicles & Equipment - Consulting & Other Services Issue Date:07/11/2022 Due Date: 08/09/2022 Ad Type:General
Village of Piermont DPW Roll Off Conversion Bid Specs Agency: Piermont, Village of Category:Vehicles & Equipment - Consulting & Other Services Issue Date:07/11/2022 Due Date: 08/09/2022 Ad Type:General
Scraping out loads frozen within roll off trucks using the “prod”. (Accessory tool coupled to loader used to reach into boxes and scrape out material) h. Snow removal using box plow and bucket. 2.
Scraping out loads frozen within roll off trucks using the “prod”. (Accessory tool coupled to loader used to reach into boxes and scrape out material) h. Snow removal using box plow and bucket. 2.
The Architect/Engineer may waive the requirements for conversion of schematic data where, in the Architect/Engineer's judgment, such conversion serves no beneficial purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the Architect/Engineer. 4. Timing of Entries: Be alert to changes in the work from how it is shown in the Contract Documents.
If a geomembrane sample fails to meet the quality control requirements of this Section, sample and test rolls manufactured, in the same resin batch, or at the same time, as the failing roll. Continue to sample and test the rolls until the extent of the failing rolls are bracketed by passing rolls. Do not supply any failing rolls. 7.
SEE SPEC. 2" THICK CONCRETE TRANSACTION COUNTER WITH OVERHEAD ROLL DOWN DOOR. SEE SPEC.
SEE SPEC. 2" THICK CONCRETE TRANSACTION COUNTER WITH OVERHEAD ROLL DOWN DOOR. SEE SPEC.