  • WO 22-34: Culvert Replacement – Schedule II; Holling Drain at Barrett Road

    Type : Bid Notification

    Due : 06 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 17 Nov, 2022 (17 months ago)

    The project consists of: Schedule II – Rehabilitate approximately 190-LF of existing 72-Inch Diameter CSP culvert in the Holling Drain crossing Barrett Road just west of W. Echo Drive by lining with 63-Inch O.D. HDPE slip-line pipe. Miscellaneous work associated with this schedule includes bypass pumping of the Holling Drain, installing riprap and geotextile, and ditch and landscape restoration.