Type : Bid Notification
IFB-24-20193: Reston Parkway Drainage Repairs, DTR Description:The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for drainage repairs of Reston Parkway on-ramps at the Dulles Toll Road (DTR). Work includes, but is not limited to, ditch and embankment repair, grading, installation of drainage structures, shoulder rehabilitation and guardrail replacement.