Type : Bid Notification
SAMPLERS IAW DRAWINGS AND WORKMANSHIP DOCUMENTSFY23 REQ #14697 HIF STK #4101018-NThe U.S.
SAMPLERS IAW DRAWINGS AND WORKMANSHIP DOCUMENTSFY23 REQ #14697 HIF STK #4101018-NThe U.S.
Geological Survey Water Science Center, Tacoma, Washington has a requirement for Parchall Flumes Accordance With Drawing and Workmanship Documents to be delivered to the USGS Hydrologic Instrumentation Facility, Building 2101, Stennis Space Center, MS 39529, no later than 30 Days After Receipt of Order.Request for Quote (RFQ) 140G0122Q0256 will be issued on or about 9/19/2022 with written quotes due on or about 9/29/2022 at 8:00 AM ED.This acquisition
• Oversee Owner testing requirements • Document and track field modifications and deviations • Maintain a current field set of drawings and specifications • Maintain daily construction logs including activities-on-site, weather, deliveries, issues, and resolutions, provide periodic reports to the Owner • Manage contract change orders including monitoring and endorsing any time and material work • Monitor and report construction progress against schedule
PLASTIC REEL, WADING TAGLINE, W/OUT CABLE IAW DRAWINGS AND WORKMANSHIP DOCUMENTS FY23 REQ #14747 HIF STK #1302005 Solicitation ID/Procurement Identifier: 140G0123Q0070 Ultimate Completion Date: Mon Mar 27 17:00:00 GMT 2023
(1).docxDocumentationGeneral description of the works and workmanship requirementsRead more...Apr 12th 2024, 3:36 PM EST - Preliminaries document.xlsxDocumentationPreliminaries document for review and inclusion by the bidding vendorRead more...Apr 12th 2024, 3:34 PM EST - Project C Drawings For Pricing.zipDocumentationZip file of drawings for pricing including a master drawing register and pre-demo ACM Survey.Read more...Apr 12th 2024, 2:25 PM EST
• Oversee Owner testing requirements • Document and track field modifications and deviations • Maintain a current field set of drawings and specifications • Maintain daily construction logs including activities-on-site, weather, deliveries, issues, and resolutions, provide periodic reports to the Owner • Manage contract change orders including monitoring and endorsing any time and material work • Monitor and report construction progress against schedule
The workmanship must be of the highest quality in its respective field.