Search results for: eagle ditch to arlington

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10,875
Looking for opportunities in Arlington, Texas, United States?
  • WO 22-40: Water Main Extension – Grey Eagle Ditch to Arlington Avenue

    Type : Bid Notification

    Due : 06 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 10 Nov, 2022 (17 months ago)

    The project consists of: the installation of approximately 390-ft of 12-inch water main and water line appurtenances completing the loop from just east of the Grey Eagle Ditch to Arlington Avenue within the borrow ditch south of South Frontage Road, including miscellaneous removal and restoration items associated with the work. Complete digital project bidding documents are available at QuestCDN.

    From: Billings (City)

  • Gott Ditch Restoration

    Type : Bid Notification

    Due : 10 May, 2024 (in 9 days)
    Posted : 21 days ago
    Started : 08 Apr, 2024 (22 days ago)

    Bid Number:5-10-24 Bid Title:Gott Ditch Restoration Category:County Project BidsStatus:OpenBid Recipient:Purchasing Department Publication Date/Time: 4/8/2024 8:00 AM Publication Information: The Chronicle Telegram Closing Date/Time: 5/10/2024 2:00 PM Submittal Information: Purchasing Department Bid Opening Information: 5/10/2024 Contact Person: Lorain County Engineer Dept Fee: 50.00 Plan & Spec Available: Lorain County Engineer Dept Business Hours

    From: Lorain (County)

  • Castor River and Ditch 39 Clearing and Snagging

    Type : Bid Notification

    Due : 02 May, 2024 (in 1 day)
    Posted : 1 month ago
    Started : 23 Apr, 2024 (7 days ago)

    The work shall be located at the confluence of Ditch 39 and Ditch 1, continue upstream on Castor River to the upstream limits of the project, approximately as indicated. The exact location will be indicated on the contract drawings.

    From: Federal Government (Federal)

  • Ditch Remediation along Highway 99

    Type : Bid Notification

    Due : 16 May, 2024 (in 15 days)
    Posted : 9 days ago
    Started : 06 Apr, 2024 (24 days ago)

    This Request for Quotations (the “RFQ”) is an invitation by the District of Squamish (the “District”) to prospective respondents to submit non-binding quotations for Contaminated Ditch Material Removal , as further described in Section A of the RFQ Particulars (Appendix D) (the “Deliverables”).

    From: Squamish (County)

  • R24-02 Ditch Remediation along Highway 99

    Type : Bid Notification

    Due : 16 May, 2024 (in 15 days)
    Posted : 10 days ago
    Started : 19 Apr, 2024 (11 days ago)

    Summary DetailsThe District of Squamish is seeking a qualified contractor for the excavation and ditch profiling of an existing ditch approximately 400m long on the west side of Highway 99, south of Industrial Way. The objective is to remove infill material and reinstate the ditch to its original design.

    From: British Columbia (State)

  • Lakewatch Stormwater Pond and Drainage Ditch Construction

    Type : Bid Notification

    Due : 15 May, 2024 (in 14 days)
    Posted : 10 days ago
    Started : 19 Apr, 2024 (11 days ago)

    Bid Title:Lakewatch Stormwater Pond and Drainage Ditch Construction Category:Franklin County Bids & Requests for ProposalStatus:Open Description: The County of Franklin is currently accepting Bids for the construction of a stormwater pond and drainage ditch at 145 Lakewatch Center Dr. Moneta VA 24121. All bids should be sealed and marked Lakewatch Stormwater Pond and Drainage Ditch in the upper left-hand corner of the envelope.

    From: Franklin (County)

  • 5000144969 Mounes St. Drainage Improvements (Crochet Ditch to Dealers Avenue)

    Type : Bid Notification

    Due : 16 May, 2024 (in 15 days)
    Posted : 10 days ago
    Started : 17 Apr, 2024 (13 days ago)

    DRAINAGE IMPROVEMENTS (CROCHET DITCH TO DEALERS AVENUE) JEFFERSON PARISH PUBLIC WORKS PROJECT NO. 2021-010-DR The project consists of the installation of precast 10’ x 8’ box culverts on Mounes St. which will tie into the existing 10’ x 8’ box culverts near Crochet Ditch and at Dealers Avenue. This Phase will Install approximately 2,460 linear feet of 10’ x 8’ box culvert and a two-story box culvert at the Crochet Ditch crossing.

    From: Jefferson Parish (Other)