Search results for: earthworks and tree

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 593
  • Earthworks and Tree Trimming Services

    Type : Bid Notification

    Due : 21 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 22 Sep, 2022 (19 months ago)

    The objective of this Blanket Purchase Agreement (BPA) is to obtain earthwork related services and tree services for all sites used by the Engineering Research and Development Center (ERDC) over the next five years. 

    From: Federal Government (Federal)

  • William Burgess Blvd. Extension

    William Burgess Blvd. Extension

    Type : Bid Notification

    Due : 18 Apr, 2024 (Today)
    Posted : 1 month ago
    Started : 11 Mar, 2024 (1 month ago)

    Most of the project is a new roadway alignment extension requiring tree clearing and grubbing, and earthwork embankment within new County ROW limits that also extend adjacent to the Yulee High and Middle School property.

    From: Nassau (County)

  • Old Celina Park Playground Improvements - Rebid

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 11 days)
    Posted : 15 days ago
    Started : 19 Mar, 2024 (1 month ago)

    The scope will include temporary fence, erosion control, demo / earthwork, moisture conditioning/select fill, structural soil, tree relocation, utilities, site concrete, stamped / integral color concrete,shade structure foundation / installation, fencing, earth shaping/ fine grading, site masonry, structuralsteel, irrigation, turf establishment, landscape, signage, site electrical, site amenities installation andboulders.

    From: Dean Construction (Other)

  • Construction Services for Waterside Way Park and Trails

    Type : Bid Notification

    Due : 06 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 31 Jul, 2023 (8 months ago)

    Construction Services for Waterside Way Park and TrailsF18-TPW-ES-2023-02Closing Date: 09/06/2023 03:00:00 PM ETDetail: DESCRIPTION OF WORK The Corporation requests Bids for the following work on the Project (the “Work”), as more fully described in the documents indicated in IB.5: (a) Site preparation and grading (b) Earthworks (c) Tree removals, clearing and grubbing (d) Wooded granular trail system (e) Asphalt pedestrian pathway system (f) Playground

    From: Kingston (City)

  • Construction Engineering & Inspection Services-Red LN. Traffic & SS 2.0

    Type : Bid Notification

    Due : 18 Nov, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 24 Oct, 2022 (18 months ago)

    engineering: Earthworks are land grading to reconfigure the topography of a site, or to stabilize slopes.

    From: Indianapolis Public Transportation (Transportation)

  • Walsh RFP for WSDOT I-90 & SR 900 Fish Passage

    Type : Bid Notification

    Due : 01 May, 2024 (in 13 days)
    Posted : 3 months ago
    Started : 25 Dec, 2023 (3 months ago)

    Concrete Paving, Guardrail, Aggregates, Trucking/Hauling, Clearing & Grubbing, Tree Removal, Pavement Markings, Drainage, Signing.

    From: Washington State Office of Minority and Women (State)

  • Dev. Services_ITB_2024 Small-Scale Infrastructure Lighting Unit Price Construction Contract

    Dev. Services_ITB_2024 Small-Scale Infrastructure Lighting Unit Price Construction Contract

    Type : Bid Notification

    Due : 18 Apr, 2024 (Today)
    Posted : 5 days ago
    Started : 08 Mar, 2024 (1 month ago)

    The major work will consist of the (approximate) following: replacement and extension of 800 feet or less of flatwork, commercial and residential sidewalks, streetlight and pedestrian light installation, 800 feet or less of landscaping, corresponding erosion control, earthwork and incidental traffic control plans.

    From: Fort Worth (City)