Search results for: eastside access and circulation

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 3 of 3
  • Central Eastside Access Circulation Improvements

    Type : Bid Notification

    Due : 30 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 05 Aug, 2022 (21 months ago)

    NO PREBID MEETING Contractors are encouraged to visit the work site Work shall include, maintain, and remove temporary work zone traffic control measures. Construct, maintain, and remove erosion control measures. Perform all removal of structures and obstruction, clearing and grubbing, and earthwork operations. Construct drainage system including water quality facilities, sewer pipes, maintenance holes and inlets. Construct roadway improvements including cold planning, aggregate base, MWMAC wearing surfaces, concrete curb and sidewalks. Type Code: 01 - Construction ITB Ship-to: Please See Solicitation Documents City of Portland Portland, OR 97204 US Email:

    From: Portland (City)

  • Management & Operation of a Non-Exclusive Rental Car Concession a the Destin-Ft. Walton Beach Airport (VPS)

    Type : Bid Notification

    Due : 17 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 07 Dec, 2020 (about 3 years ago)

    Service Maintenance Facility - In 2009, the County financed and constructed a rental car consolidated wash, service, fueling, and automobile storage facilities (“Service Facilities”) and an eastside vehicular access to serve the Service Facilities. The project also included a reworking and modification of the existing ready/return area on the east side of the Terminal into a new, 439-space consolidated ready/return area. 2.

    From: Okaloosa (County)