Search results for: edge lighting and signage

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 97
  • PUR-1635 Hagerstown Regional Airport Runway 9-27 Edge Lighting & Signage Replacement

    Type : Bid Notification

    Due : 01 Oct, 2024 (in 5 months)
    Posted : 3 months ago
    Started : 18 Dec, 2023 (4 months ago)

    PUR-1635 Hagerstown Regional Airport Runway 9-27 Edge Lighting & Signage Replacement Date / Time: October 25, 2023 / 2:00 P.M. Tele-Conference Date / Time: October 4, 2023 / 1:00 P.M. Attachments: Design Report , Drawings , Addenda: Addendum 1 , Addendum 2 , Bid Tabulation: Bid Tab Agenda Report Form: ARF – Awarded as Recommended

    From: Washington (County)

  • PUR-1635 Hagerstown Regional Airport Runway 9-27 Edge Lighting & Signage Replacement

    Type : Bid Notification

    Due : 25 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 10 Oct, 2023 (6 months ago)

    PUR-1635 Hagerstown Regional Airport Runway 9-27 Edge Lighting & Signage Replacement Date / Time: October 25, 2023 / 2:00 P.M. Tele-Conference Date / Time: October 4, 2023 / 1:00 P.M. Attachments: Design Report , Drawings , Addenda: Addendum 1 , Addendum 2 , Bid Tabulation: Bid Tab Agenda Report Form:

    From: Washington (County)

  • Runway 9L-27R Rehabilitation & Taxiway K1 Demolition

    Type : Bid Notification

    Due : 10 May, 2024 (in 11 days)
    Posted : 17 days ago
    Started : 10 Apr, 2024 (19 days ago)

    The Base Bid includes mill and overlay of Runway 9L-27R (8,600’x150’); reconstruction of the Runway 9L blast pad; mill and overlay of the Runway 9L-27R paved shoulders; mill and overlay of associated taxiway connections; replacement of runway edge lights, guidance signs, and distance remaining signs; airfield electrical vault modifications and upgrades; replacement of the Runway 9L 4-box PAPI system; repair and rehabilitation of drainage pipes crossing

    From: Sanford Airport Authority (Airport)

  • Bid #23047 - Calabro Municipal Airport Reconstruct Runway 15-33 Edge Lighting & Signage

    Type : Contract

    Due : 08 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 18 May, 2023 (11 months ago)

    Bid #23047 - Calabro Municipal Airport Reconstruct Runway 15-33 Edge Lighting & Signage Agency: Brookhaven, Town of Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:05/18/2023 Due Date: 06/08/2023 Ad Type:General

    From: New York State Contract Reporter (City)

  • Bid #22035 - Calabro Municipal Airport Reconstruct Runways 6-24 & 15-33 Edge Lighting & Signage

    Type : Contract

    Due : 09 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 19 May, 2022 (23 months ago)

    Bid #22035 - Calabro Municipal Airport Reconstruct Runways 6-24 & 15-33 Edge Lighting & Signage Agency: Brookhaven, Town of Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:05/19/2022 Due Date: 06/09/2022 Ad Type:General

    From: New York State Contract Reporter (City)

  • Malone Dufort Airport (MAL) Lighting & Signage Improvements - Malone, New York

    Type : Bid Notification

    Due : 10 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 03 May, 2022 (about 2 years ago)

    Project:Malone Dufort Airport (MAL) Lighting & Signage Improvements - Malone, New YorkProject #:20110405.0019Description:The Base Bid project generally consists of replacement of medium intensity edge lighting on Runway 5-23, and Taxiway A, two wind cones, and three lighted signs, including replacement of associated cabling, conduit, and regulators.

    From: Passero Associates Engineering Architecture (Federal)

  • Rutherfordton, NC/ New Airfield Edge Lighting, Signage & Navaids

    Type : Bid Notification

    Due : 22 Nov, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 03 Nov, 2022 (18 months ago)

    Rutherfordton, NC – New Airfield Edge Lighting, Signage & Navaids (20220061.00.CL) The project scope will include replacement of the existing airfield lighting, signage, PAPI’s, REIL’s, windcones, and rotating beacon with new LED fixtures. Equipment within the exiting electrical vault building will be replaced as well. For information regarding this project please contact: Greg Kershaw W.K. Dickson & Co., Inc.

    From: The Institute Economic Development (State)