Type : Bid Notification
RayPak X-Fyre series high efficiency condensing boiler shipped to customer.
RayPak X-Fyre series high efficiency condensing boiler shipped to customer.
All work should be confined to the boiler rooms in the garage and barracks. C. Work consists of the installation of a new high efficiency condensing boiler and related components ( circulating pumps, air separators and expansion tanks) complete with new connections to the existing breeching, piping and electrical connections. The existing boiler is to be disconnected 'and discarded by the contractor.
Pre Bid Conference: Pre Bid Conference: Site Visit: 9/30/2020 ? 10:30 AM - Management office 1 Cliffmont St, Roslindale, MA 02131. Bulletin Desc: Purchaser: Ben Liang Organization: Boston Housing Authority Ship-to-Address : BHA 52 Chauncy St Various Locations in City of Boston per PO Boston, MA 02111 US Email: bids@bostonhousing.org Phone: (617)988-4038 FAX: (617)988-4292
The contractor shall schedule and perform a construction task for the replacement of the existing heating boiler system in Building 304 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will provide complete and operable boiler systems for B304. The replacement boiler shall be high efficiency condensing boiler.
Replace boiler with high efficiency condensing boiler and new high efficiency hot water pump.5. Modify control sequences.6.
boiler - final.pdf Specifications for high efficiency condensing hot water boilers283 KB
Responding firms will also be required to demonstrate professional services which include, but are not limited to; design, construction, start-up and commissioning of high efficiency condensing boiler heating systems, combination air eliminator / dirt separator / hydraulic separator and variable speed circulation pumps. The existing boiler is a Rendamax R18, copper water tube, natural gas fired unit that has been in service since 1994.