Search results for: effluent channel

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 71
  • CBWTP Effluent Channel Wash Waterline Replacement

    Type : Bid Notification

    Due : 13 Dec, 2022 (16 months ago)
    Posted : 18 months ago
    Started : 07 Nov, 2022 (18 months ago)

    Mazama, 5001 N Columbia Blvd, Portland OR 97203 Scope of Work includes construction of new wash water (WW) distribution lines adjacent the secondary effluent channel, in Tunnel 113, Silver Tunnel, and Tunnel 08 at CBWTP. Type Code: 01 - Construction ITB Ship-to: Please See Solicitation Documents 1120 SW 5th Ave.

    From: Portland (City)

  • Primary Effluent (PE) Channel Upgrade

    Type : Bid Notification

    Due : 17 Mar, 2023 (13 months ago)
    Posted : 15 months ago
    Started : 17 Jan, 2023 (15 months ago)

    Refer to section 2.3 of the NRFP Main Body for additional details.All the work related to the Gold Bar Wastewater Treatment Plant (“WWTP”) Primary Effluent Channels will be carried out as a program of interrelated and interconnected projects.

    From: Edmonton Power Corporation (Co-op)

  • Effluent Barscreen Channel Gates - WTP

    Type : Bid Notification

    Due : 17 May, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Apr, 2021 (about 3 years ago)

    Effluent Barscreen Channel Gates - WTP Status: Open RFQ 405198-1 Hampton Roads Sanitation District -Williamsburg Treatment Plant, 300 Ron Springs Road, Williamsburg VA Closing On: 5/17/21 2:30 PM Time Left: 11 days, 6 hours Contractor shall furnish and deliver replacement effluent barscreen channel gates. Installation Not Required. All shall be in accordance with the attached Specifications, Drawings, Requirements, Terms and Conditions.

    From: Virginia (State)

  • Wastewater Treatment Plant Flood Protection Berm

    Type : Bid Notification

    Due : 24 Apr, 2024 (9 days ago)
    Posted : 1 month ago
    Started : 05 Mar, 2024 (1 month ago)

    Berm control structure installation in the existing wastewater effluent channel to the river,i. Berm concrete retaining wall around existing pump station electrical panel,j. Coordination with Capital Project Coordinator and Plant Operations and Maintenance for any required shutdowns,k. Effluent channel diversion,l. Entrance road regrading and storm system upgrades, m.

    From: Red Deer (City)

  • WWTP Primary Sedimentation Tank Inlet Gate Valve Replacement Project (Design, Tendering, CA Services)

    Type : Bid Notification

    Due : 27 Jan, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 09 Jan, 2023 (16 months ago)

    (IDC) and effluent distribution channel (EDC).

    From: MerX (Federal)

  • McFarland WWTP 14 UV Module Replacements

    Type : Bid Notification

    Due : 26 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 30 Apr, 2021 (about 3 years ago)

    Bidders may contact GCDWR at (440) 279-1970 or info@gcdwr.org for any questions or to schedule a site visit at McFarland WWTP to view the effluent channel in which the UV modules will be utilized by May 25, 2021. No site visits will be scheduled after May 25, 2021. Detailed specifications are posted on the GCDWR webpage or can be obtained at number above.

    From: Geauga County (County)

  • McFarland WWTP 14 UV Modules Replacements

    Type : Bid Notification

    Due : 05 May, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 08 Apr, 2021 (about 3 years ago)

    Bidders may contact GCDWR at (440) 279-1970 or info@gcdwr.org for any questions or to schedule a site visit at McFarland WWTP to view the effluent channel in which the UV modules will be utilized by April 30, 2021. No site visits will be scheduled after April 30, 2021. Detailed specifications are posted on the GCDWR webpage. A copy of this legal notice is posted on the Geauga County’s website.

    From: Geauga County (County)