Type : Bid Notification
The proposed scope of work consists of the rehabilitation of the effluent transfer pump station and associated structures.Show Less
The proposed scope of work consists of the rehabilitation of the effluent transfer pump station and associated structures.Show Less
Bid Details Planholder ECR - Effluent Transfer Pumps Replacement Project Active Browse Awarded Bids Download Bid Package Bid Details Agency Name City of West Palm Beach Bid Writer Donna Levengood Bid ID ITB-22-23-102 RL-0-2023/DL Bid Type ITB - Invitation to Bid Broadcast Date 11/04/2022 5:57 PM Eastern Fiscal Year 2023 Due Date 01/11/2023 3:00 PM Eastern Bid Status Text None Scope of Work The East Central Regional Wastewater Treatment Facilities
Water Reclamation Facility and installation of four new vertical turbine transfer pumps.
Electrical upgrades to the existing 16” vertical turbine effluent transfer pumps (#5 & #6) and the electrical upgrades to the new 16” vertical turbine effluent transfer pumps (#1 - #4) to include, but not limited to, the replacement and installation of new disconnect switches, replacement and installation of new conduit, conduit fittings, all wiring for the effluent transfer pumps and pressure switches, grounding improvements and all other related
Scope one (1) effluent transfer pump; one (1) blower, one (1) air distribution header, aeration basin air diffusers, aeration basin RAS/WAS airlift, walkway assembly between aeration basins, walkway assembly between aeration basin and chlorine contact basin, walkway assembly at filter, recoating of chlorine contact basin, generator, and electrical improvements per the drawings and specifications.
Check the effluent transfer pumps for proper operation. 1.1.17. Check Amp Draw on pumps and record. 1.1.18. Hand operate to manually check Floats or sensors and insure they are working, High water, low water shut off, lag pump, lead pump. 1.1.19. Clean off floats. 1.1.20. Check for debris in pits, remove possible debris such as grease, solids, etc. with hand net, determine if additional cleaning will be required and report to owner. 1.1.21.
Job Description: Upgrades to the existing influent pump station and force main, headworks, new transfer pump station, new effluent Parshall flume structure, new storage building, new vac truck dump station, misc yard piping. Plans and specs available for review at the following: – WithersRavenel 115 MacKenan Dr.