Multiple Victoria-Class Spares - Communication, Electrical and Electronic Equipment Components (W8482-220135/C) Project Description :The Department of National Defence has a requirement for the items detailed below. The delivery is requested at CFB Esquimalt and CFB Halifax.
Added: Nov 08, 2017 11:22 am The USCG Surface Forces Logistics Center has a requirement to Open, Inspect, Report, and Repair the following IAW the attached Scope of Work: (1) NSN: 5925 01-583-8452 CIRCUIT BREAKER MFG: EATON CORP. CUTLER-HAMMER SALES OFE Part no: MDS6163WEA-1652ANAA6YNNNAX QUANTITY: 03 EACH USED ON: WMEC 270 WMEC SWITCHBOARDS **Provide documents stating authorized repair facility for OEM and can provide OEM parts** ** OVERHAUL DESCRIPTIPTION AVAILABLE UPON REQUEST** Substitute parts are not acceptable. It is anticipated that a non-competitive sole source purchase order shall be awarded as a result of this synopsis/solicitation. It is the Government's belief that only EATON CORP. CUTLER-HAMMER SALES OFE and/or their...
Provisions and clauses applicable to this procurement include but are not limited to the following: Section C: HQ C-2-0024, Extension of Commercial Warranty (NAVSEA) Section F: FAR 52.247-34, FOB Destination Ddl-F20, Receiving Hours of Operation - NSWC Dahlgren Ddl-F30, Partial Shipments Ddl-F40 Contractor Notice Regarding Late Delivery Section G: FAR 52.232-18, Availability of Funds DFARS 252.232-7003, Electronic Submission of Payment Requests and
The Naval Facilities Engineering Command, Hawaii is seeking alternate products/sources comparable to the two “Brand Name” components below: 1. SEL – 751 Feeder Protection Relay, manufactured by Schweitzer Engineering Laboratories (SEL), 2350 NE Hopkins Court, Pullman, WA 99163. The alternate product/source must meet the following requirements/specifications: a.
Added: Jan 24, 2019 3:56 pm Modified: Feb 12, 2019 1:39 pm Track Changes This requirement has been cancelled and will be re-solicited on FEDBID.
All electronic equipment shall continuously self-test and report internal errors. They shall also have a hardwire contact indicating device health. d. The system shall include an integrated IEC 61131-3 programming environment for the information processor, with the ability to monitor and control every protective relay and Ethernet distributed I/O module in the substation continuously.
Added: Mar 07, 2019 12:45 pm NO SYNOPSIS IS REQUIRED IAW FAR 5.202(a)(13)(i), which provides the contracting officer need not synopsize when the proposed contract action is for an amount not expected to exceed the simplified acquisition threshold.
Added: Mar 11, 2019 10:30 am NO SYNOPSIS IS REQUIRED IAW FAR 5.101(a)(1), which provides that a synopsis is not required when the proposed contract action is for an amount not expected to exceed $25,000.
Added: Oct 11, 2019 6:48 pm NO SYNOPSIS IS REQUIRED IAW FAR 5.202(a)(13)(i), which provides the contracting officer need not synopsize when the proposed contract action is for an amount not expected to exceed the simplified acquisition threshold.