Search results for: elena street slope repair

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 23
  • Elena Street Slope Repair and Utilities Replacement Project

    Type : Bid Notification

    Due : 15 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 12 Nov, 2022 (17 months ago)

    Bid Number:MB2020-SD03 Bid Title:Elena Street Slope Repair and Utilities Replacement Project Category:Construction ServicesStatus:Open Description: ELENA STREET SLOPE REPAIR AND UTILITIES REPLACEMENTS PROJECT Project No.

    From: Morro Bay (City)

  • 2024 Walden Lane Pavement Reconstruction

    Type : Bid Notification

    Due : 23 Apr, 2024 (8 days ago)
    Posted : 28 days ago
    Started : 03 Apr, 2024 (28 days ago)

    Sign Modifications (Relocation of Speed Limit and Street Name Signs) 2 EA - Each See Contract Documents P21 Landscape Restoration 1 LS - Lump Sum See Contract Documents P22 7" Thick Pulverized Pavement Base Course (FDR) 65,000 SF - Square Feet See Contract Documents P23 Beef Hollow Rock Mulch (5" Deep) 3,700 SF - Square Feet See Contract Documents P24 Park Strip Weed Fabric 3,700 SF - Square Feet See Contract Documents P25 Street Light 2 EA - Each

    From: Utah (State)

  • Enchanted Hills Boulevard Reconstruction Project

    Type : Bid Notification

    Due : 30 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 05 Jun, 2023 (11 months ago)

    Project: Enchanted Hills Boulevard Reconstruction Project Ref. #: IFB 23-PW-019 Type: IFB Status: Open Open Date: Jun 5th 2023, 9:00 AM MDT Questions Due Date: Jun 20th 2023, 5:00 PM MDT Contact Information: Danetta Chavez, dachavez@rrnm.gov Close Date: Jun 30th 2023, 11:00 AM MDT Days Left: 2 Project Description:The City of Rio Rancho is soliciting formal bids for the full-depth roadway reconstruction of Enchanted Hills Boulevard from Paseo Del Vulcan to NM 528. This will include new curb ramps to meet current ADA requirements, replacement of damaged curb stones, and new thermoplastic striping. Additive Alternates include: in-depth roadway reconstruction from Chayote Road to Paseo Del ...

    From: City of Rio Rancho (City)

  • Pavement Resurfacing - Santa Rosa Valley Area

    Type : Bid Notification

    Due : 29 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 14 Jun, 2023 (10 months ago)

    See more details...

    From: Ventura County Public Works (County)

  • VALVE ASSEMBLY

    Type : Bid Notification

    Due : 28 Jul, 2023 (9 months ago)
    Posted : 9 months ago
    Started : 21 Jul, 2023 (9 months ago)

    CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 5 OF 23 PAGES SPE4A6-23-T-15ZF SECTION A contracts and rates. Offers should be submitted based on FOB Origin. For offerors whose shipments will orginate from outside the contiguous United States, the offeror's FOB Origin price shall include transportation to a contiguous United States location that the offeror selects based on cost effectiveness or other variables at the offeror's discretion. Additional information about FDT can be found at: http://www.dla.mil/FDTPI/ CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 23 PAGES SPE4A6-23-T...

    From: Federal Government (Federal)

  • Enchanted Hills Boulevard Reconstruction Project

    Type : Bid Notification

    Due : 30 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 05 Jun, 2023 (11 months ago)

    Project: Enchanted Hills Boulevard Reconstruction Project Ref. #: IFB 23-PW-019 Type: IFB Status: Open Open Date: Jun 5th 2023, 9:00 AM MDT Questions Due Date: Jun 20th 2023, 5:00 PM MDT Contact Information: Danetta Chavez, dachavez@rrnm.gov Close Date: Jun 30th 2023, 11:00 AM MDT Days Left: < 1 Project Description:The City of Rio Rancho is soliciting formal bids for the full-depth roadway reconstruction of Enchanted Hills Boulevard from Paseo Del Vulcan to NM 528. This will include new curb ramps to meet current ADA requirements, replacement of damaged curb stones, and new thermoplastic striping. Additive Alternates include: in-depth roadway reconstruction from Chayote Road to Paseo De...

    From: Rio Rancho (City)

  • Pavement Resurfacing - Santa Rosa Valley Area

    Type : Bid Notification

    Due : 29 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 14 Jun, 2023 (10 months ago)

    eh Bi ncedbon, Ailiore CA | epsiyg P86, 7 Greencoast Landscapes, Lac. warille, Frimuing ; 299 Clalreshe 3 Onyx Aaviag haheinn CA bibslebon Qiyfaly, zie, e licensed State Californ , under subcontract to the prime contractor, specially fabricate nstalls portion work or improvement according to detailed drawings ntain lans ecifi ions, in an amount in excess of one-half of 1 percent the Facto bid _in the case of bids or offers for the construction of streets

    From: Ventura (County)