Type Request for Proposal- Sealed Status Issued Number Elevated Storage Evaluation - Feasibility Study (202206070801) Issue Date & Time 6/8/2022 03:00:00 PM (ET) Close Date & Time 7/6/2022 02:00:00 PM (ET) Time Left9 days 1 hours 47 minutes 11 seconds Notes Notice to Bidders: Sealed Proposals in response to this Request for Proposal (“RFP”) will be received by the Board of Water and Light (“BWL”) for furnishing of Elevated Storage Evaluation - Feasibility
Bid contact:Please log in to view Bid contact informationIssuing agency:City of Oklahoma City and its Trusts, OKSee other Bids by this agencyBid Comments: OCWUT WC-0991, MacArthur Elevated Storage Tank Rehabilitation, MacArthur Boulevard and NW 28th Street, Pre-qual Water Facilities "B" Bid Bond:Please log in to see bid bond informationClassification codes: View classification codesContract duration:One Time PurchaseContract renewal:Not ApplicablePrices
THE PURPOSE OF THIS AMENDMENT TO SOLICITATION 36C24522R0079 IS TO PROVIDE DRAWINGS AND ADDITIONAL DETAILS REGARDING THE TANK. **ALL OTHER TERMS AND CONDITIONS OF THE ORIGINAL SOLICITATION DOCUMENT SHALL REMAIN UNCHANGED. Product Service Code:- Z1NE - MAINTENANCE OF WATER SUPPLY FACILITIES NAICS Code:- 238320 - Painting and Wall Covering Contractors Primary point of contact:- Lisa M Lake Lisa.Lake2@va.gov Secondary point of contact:-
Demere Road Elevated Storage Tank (Tank Identification SS104EST) is approximately 145 feet tall and 500,000 gallons elevated tank constructed in 1975 which is located on 2731 Demere Road; Saint Simons Island, Georgia 31522.
Bid submissions shall be plainly marked with the name and address of the bidder and “BID NO. 21-32 CHAPARRAL ELEVATED STORAGE TANK, 2:00 P.M., July 1, 2021”. Submittals received after the closing time will be returned unopened.
Owen Lane Elevated Storage Tank Rehabilitation Project New 2.0 MG Elevated Storage Tank Open Date: 06/08/17 02:00 PM Agency Requisition Number: 2017-037 NOTE: You will need to download all of the following files for complete specifications and other required document, including a HUB subcontracting plan(if required).
Storage Tank URL: Addendum: Class/Item Code: 83033-Filters, Storage Tank 83073-Steel Tanks, Water Works Type, Elevated And Tower
The proposed project includes a new composite-style elevated storage tank with and estimated volume of 750,000 gallons located near the Campton community; and two new pressure reducing/control valves, one on Nicholsville Road and one on HD Atha Road, that will establish a new East Walton Pressure Zone. The new Campton elevated storage tank will be integrated into Walton County’s existing SCADA system, to provide for remote monitoring.
Description: Proposals will be publicly opened and read at the office of the City Manager, 209 South Main Street, Marysville, Ohio 43040 at 2:00 p.m., Local Time, on May 28, 2021 for the construction of: CITY OF MARYSVILLE Jerome Township Elevated Storage Tank The project consists of the following: Constructing a new composite elevated storage tank with a capacity of 1.5 million gallons.