  • Replacement of Complete Power Distribution, Asphalt Pavement and Light Standard and Elevator Upgrade at Professor's Lake Recreation Centre

    Type : Bid Notification

    Due : 16 May, 2024 (in 11 days)
    Posted : 15 days ago
    Started : 03 Apr, 2024 (1 month ago)

    The asphalt pavement needs to be replaced at the main parking lot (from the west elevation of the main building all the way to the east limit of the asphalt), the main driveway and drive aisle, and at the boat ramp. Localized asphalt replacement is required at the other two parking lots.

    From: Brampton (City)

  • 8 (a) MACC Demolition of Building SDA 213

    Type : Bid Notification

    Due : 07 May, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 04 May, 2021 (about 3 years ago)

    The foundation will be demolished flush to the building slab. Portions of the building slab will remain to facilitate open storage for Defense Logistics (DLA) Disposition Services. Any holes, floor drains, and on level surfaces will be patched to match existing elevation of building slab. Demolition will include removal of all of utilities and abatement of all asbestos containing materials.

    From: Federal Government (Federal)

  • THREE CANOPIES FOR EXTERIOR DOOR ENTRANCES AT BUILD 14 WEST ELEVATION OF BUILDING.

    Type : Contract

    Due : 19 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Jul, 2021 (about 2 years ago)

    THREE CANOPIES FOR EXTERIOR DOOR ENTRANCES AT BUILD 14 WEST ELEVATION OF BUILDING. Solicitation ID/Procurement Identifier: HHSF223201610036I Ultimate Completion Date: Tue Oct 19 17:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • Elizabeth Catlett Residence Hall - Install Catwalk to Service Kitchen Exhaust Fans

    Type : Bid Notification

    Due : 27 Apr, 2023 (12 months ago)
    Posted : 11 months ago
    Started : 14 Apr, 2023 (12 months ago)

    Project #:0976601Scope:This project involves professional design and engineering services for the design and installation of three (3) separate catwalks on Catlett Hall on the east exterior elevation of the building to provide access for maintenance to allow service to kitchen exhaust fans.Building:Elizabeth Catlett Residence HallProject Status:ConstructionProject Manager:Michael D LeClere

    From: University of Iowa (Higher Education)

  • Y1DZ--Expand Building 1 D-Wing Project No: 565-135

    Type : Pre-Bid Notification

    Due : 29 Jun, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 22 Jun, 2021 (about 2 years ago)

    The project s purpose is as follows: PURPOSE The purpose of this project is to construct a planned expansion on the South East Elevation of Building 1 and the existing site and includes the complete demolition of Building 8 and a 2 story expansion and renovation including a 4 story elevator and shaft, patient drop off canopies on the South and North building entries of the addition and site modifications.

    From: Federal Government (Federal)

  • Owego <b>Elevation</b> Trahan Residence Phase II

    Owego Elevation Trahan Residence Phase II

    Type : Contract

    Due : 15 May, 2024 (in 10 days)
    Posted : 12 days ago
    Started : 22 Apr, 2024 (12 days ago)

    Owego Elevation Trahan Residence Phase II Agency: Owego, Village of Category:Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction Issue Date:04/22/2024 Due Date: 05/15/2024 Ad Type:General

    From: New York State Contract Reporter (City)

  • South Power Plant Exterior Repairs

    Type : Bid Notification

    Due : 10 Apr, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 20 Mar, 2019 (about 5 years ago)

    WALK THROUGH/SITE VISIT: Wednesday, March 27, 2019 at 11:30am at 880 Broadway St., Lowell, MA 01854 ------- Project consists of repairs to East Elevation of South Power Plant Building exterior.

    From: University of Massachusetts (Higher Education)